Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

567

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other rubber product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0297 #07 Y:2026 Reduce the pressure of compressed air to the minimum required $1,636 $530
UU0297 #06 Y:2026 Install compressor air intakes in coolest locations $1,370 $6,700
UU0297 #05 Y:2026 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,190 $7,200
UU0297 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $4,000 $30,500
UU0297 #03 Y:2026 Minimize water usage $26,601 $91,000
UU0297 #02 Y:2026 Keep doors and windows shut when not on use $5,030 $43,200
UU0297 #01 Y:2026 Convert liquid heaters from underfiring to immersion or submersion heating $6,550 $23,886
GT1003 #10 Y:2025 Use solar heat to make electricty $116,617 $694,521
GT1003 #09 Y:2025 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $107,574 $414,000
GT1003 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $18,909 $61,212
GT1003 #07 Y:2025 Repair and eliminate steam leaks $1,657 $1,850
GT1003 #06 Y:2025 Turn off equipment during breaks, reduce operating time $1,390 $1,495
GT1003 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,175 $1,850
GT1003 #04 Y:2025 Reduce space conditioning during non-working hours $1,117 $600
GT1003 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $5,754 $2,400
GT1003 #02 Y:2025 Turn off equipment when not in use $19,447 $6,600
GT1003 #01 Y:2025 Use highest temperature for chilling or cold storage $1,244 $400
NT0055 #07 Y:2025 Lower temperature during the winter season and vice-versa $2,034 -
NT0055 #06 Y:2025 Analyze flue gas for proper air/fuel ratio $2,718 $1,258
NT0055 #05 Y:2025 Optimize plant power factor $14,093 $21,896