Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

550

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other rubber product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0055 #07 Y:2025 Lower temperature during the winter season and vice-versa $2,034 -
NT0055 #06 Y:2025 Analyze flue gas for proper air/fuel ratio $2,718 $1,258
NT0055 #05 Y:2025 Optimize plant power factor $14,093 $21,896
NT0055 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $15,120 $5,753
NT0055 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $24,015 $28,383
NT0055 #02 Y:2025 Use or replace with energy efficient substitutes $101,058 $149,003
NT0055 #01 Y:2025 Train operators for maximum operating efficiency $125,000 $65,200
IC0338 #09 Y:2025 Use waste heat from hot flue gases to preheat incoming fluids $5,570 $19,032
IC0338 #08 Y:2025 Eliminate or reduce compressed air usage $833 $576
IC0338 #07 Y:2025 Insulate bare equipment $34,779 $59,600
IC0338 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,751 $2,378
IC0338 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,505 $3,178
IC0338 #04 Y:2025 Install occupancy sensors $4,703 $7,750
IC0338 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $812 $1,669
IC0338 #02 Y:2025 Lower temperature during the winter season and vice-versa $1,183 -
IC0338 #01 Y:2025 Add equipment/ operators to reduce production bottleneck $1,219,168 $500,000
NL0113 #08 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $374 $500
NL0113 #07 Y:2025 Install occupancy sensors $2,902 $772
NL0113 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $3,978 $3,292
NL0113 #05 Y:2025 Apply for tax-free status for energy purchases $5,520 $400