Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,007

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other rubber product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0313 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $2,284 $1,200
TT0313 #07 Y:2024 Recover waste heat from equipment $29,164 $15,000
TT0313 #06 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $8,134 $3,000
TT0313 #05 Y:2024 Insulate bare equipment $640 $87
TT0313 #04 Y:2024 Eliminate or reduce compressed air usage $21,724 $2,600
TT0313 #03 Y:2024 Eliminate leaks in water lines and valves $4,207 $340
TT0313 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $34,255 $2,625
TT0313 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $7,143 $60
CC0038 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $2,471 $1,560
CC0038 #07 Y:2024 Use cooling tower water instead of refrigeration $10,304 $24,675
CC0038 #06 Y:2024 Eliminate cooling of process streams which subsequently must be heated and vice versa $8,129 $6,200
CC0038 #05 Y:2024 Use solar heat to make electricty $143,864 $738,776
CC0038 #04 Y:2024 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $34,175 -
CC0038 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $21,339 $20,000
CC0038 #02 Y:2024 Install smaller boiler (increase high fire duty cycle) $48,942 $14,000
CC0038 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $68,643 $40,000
UC2402 #09 Y:2024 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $6,701 $64,088
UC2402 #08 Y:2024 Utilize controls to operate equipment only when needed $1,934 $155
UC2402 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $419 $1,300
UC2402 #06 Y:2024 Utilize controls to operate equipment only when needed $4,612 $30