Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,007

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other rubber product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0756 #03 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $3,491 $1,000
OK0756 #02 Y:2007 Install / repair insulation on steam lines $31,429 $11,000
OK0756 #01 Y:2007 Begin a practice of predictive / preventative maintenance $2,140 $200
SF0351 #12 Y:2007 Utilize higher efficiency lamps and/or ballasts $23,836 $93,064
SF0351 #11 Y:2007 Insulate bare equipment $493 $979
SF0351 #10 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $1,144 $1,792
SF0351 #09 Y:2007 Reduce excessive boiler blowdown $1,877 $2,802
SF0351 #08 Y:2007 Insulate bare equipment $685 $503
SF0351 #07 Y:2007 Utilize controls to operate equipment only when needed $1,173 $228
SF0351 #06 Y:2007 Install occupancy sensors $2,396 $290
SF0351 #05 Y:2007 Insulate bare equipment $584 -
SF0351 #04 Y:2007 Utilize controls to operate equipment only when needed $1,173 -
SF0351 #03 Y:2007 Reduce the pressure of compressed air to the minimum required $3,240 $150
SF0351 #02 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $3,336 -
SF0351 #01 Y:2007 Repair and eliminate steam leaks $3,571 -
TT0015 #05 Y:2007 Utilize higher efficiency lamps and/or ballasts $3,011 $16,913
TT0015 #04 Y:2007 Utilize higher efficiency lamps and/or ballasts $33,236 $99,598
TT0015 #03 Y:2007 Repair or replace steam traps $2,000 $1,600
TT0015 #02 Y:2007 Re-use or recycle hot or cold process exhaust air $17,800 $35,600
TT0015 #01 Y:2007 Optimize plant power factor $8,343 $10,000