ITAC Assessment: OK0756
ITAC logo
ITAC Assessment: OK0756
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Composite Decking
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 75,000
ft2
Annual Production 2,900,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,697,684 34,284,696
kWh
Natural Gas $15,492 1,291
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,585 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,491

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 4.611: Begin a practice of predictive / preventative maintenance $2,140 $200 $2,140
-
kWh
02 2.2136: Install / repair insulation on steam lines $31,429 $11,000 $31,429
637,954
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,491 $1,000 $3,491
85,680
kWh
04 2.4239: Eliminate or reduce compressed air usage $3,469 $7,702 $3,469
70,080
kWh
05 2.2511: Insulate bare equipment $36,391 $6,600 $36,391
735,183
kWh
06 2.2511: Insulate bare equipment $12,665 $8,800 $12,665
255,870
kWh
TOTAL RECOMMENDED $89,585 $35,302 $89,585
1,784,767
kWh
TOTAL IMPLEMENTED $3,491 $1,000 $3,491
85,680
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs