ITAC Assessment: SF0351
ITAC logo
ITAC Assessment: SF0351
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Elastomeric Rubber Products
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 160,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,471 1,630,247
kWh
Electricity Demand $31,245 7,072
kW-mo/yr
Electricity Fees $3,869 -
Natural Gas $279,459 30,681
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,508 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,743

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $3,571 - - - $3,571
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,336 - $3,336
31,991
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,240 $150 $2,785
23,346
kWh
$455
-
kW-mo/yr
-
04 2.6231: Utilize controls to operate equipment only when needed $1,173 - $1,173
6,837
kWh
- -
05 2.2511: Insulate bare equipment $584 - $584
4,900
kWh
- -
06 2.7135: Install occupancy sensors $2,396 $290 $1,941
16,268
kWh
$455
-
kW-mo/yr
-
07 2.6231: Utilize controls to operate equipment only when needed $1,173 $228 $1,173
6,837
kWh
- -
08 2.2511: Insulate bare equipment $685 $503 - - $685
-
MMBtu
09 2.1241: Reduce excessive boiler blowdown $1,877 $2,802 - - $1,877
-
MMBtu
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,144 $1,792 $1,144
9,587
kWh
- -
11 2.2511: Insulate bare equipment $493 $979 - - $493
-
MMBtu
12 2.7142: Utilize higher efficiency lamps and/or ballasts $23,836 $93,064 $19,928
167,057
kWh
$3,908
-
kW-mo/yr
-
TOTAL RECOMMENDED $43,508 $99,808 $32,064
266,823
kWh
$4,818
-
kW-mo/yr
$6,626
-
MMBtu
TOTAL IMPLEMENTED $30,743 $93,064 $23,264
199,048
kWh
$3,908
-
kW-mo/yr
$3,571
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings