ITAC Assessment: TT0015
ITAC logo
ITAC Assessment: TT0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Rubber O-Rings
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 40,200
ft2
Annual Production 24,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $387,764 8,495,400
kWh
Electricity Demand $245,958 18,791
kW-mo/yr
Natural Gas $22,892 1,381
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $8,343 $10,000 - - $8,343 -
02 2.2443: Re-use or recycle hot or cold process exhaust air $17,800 $35,600 - - - $17,800
-
MMBtu
03 2.2113: Repair or replace steam traps $2,000 $1,600 $2,000
39,760
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $33,236 $99,598 $13,837
283,361
kWh
$19,399
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,011 $16,913 $1,253
25,676
kWh
$1,758
-
kW-mo/yr
- -
TOTAL RECOMMENDED $64,390 $163,711 $17,090
348,797
kWh
$21,157
-
kW-mo/yr
$8,343 $17,800
-
MMBtu
TOTAL IMPLEMENTED $2,000 $1,600 $2,000
39,760
kWh
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs