| Assessment Year | 1996 |
|---|---|
| Principal Product | Molded Expanded Plastic |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 33 |
| Plant Area |
100,000
ft2
|
| Annual Production | 2,500,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $176,630 | 2,473,329 |
kWh
|
$0.071 |
| Natural Gas | $116,050 | 43,104 |
MMBtu
|
$2.69 |
| Fuel Oil #2 | $8,273 | 2,115 |
MMBtu
|
$3.91 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,840 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,940 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.5194: Redesign process | $7,850 | $1,000 | - | - |
$7,850
-
Tgal
|
|
| 02 | 2.2136: Install / repair insulation on steam lines | $2,560 | $1,190 | - |
$2,560
-
MMBtu
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,350 | $1,000 | - |
$3,350
-
MMBtu
|
- | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $3,550 | $6,400 | - |
$3,550
-
MMBtu
|
- | |
| 05 | 2.7144: Install spectral reflectors / delamp | $3,530 | $9,020 |
$3,530
58,617
kWh
|
- | - | |
| TOTAL RECOMMENDED | $20,840 | $18,610 |
$3,530
58,617
kWh
|
$9,460
-
MMBtu
|
$7,850
-
Tgal
|
||
| TOTAL IMPLEMENTED | $13,940 | $11,210 |
$3,530
58,617
kWh
|
$2,560
-
MMBtu
|
$7,850
-
Tgal
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs