ITAC Assessment: GT0572
ITAC logo
ITAC Assessment: GT0572
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Molded Expanded Plastic
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 33
Plant Area 100,000
ft2
Annual Production 2,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,630 2,473,329
kWh
Natural Gas $116,050 43,104
MMBtu
Fuel Oil #2 $8,273 2,115
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,840 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,940

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.5194: Redesign process $7,850 $1,000 - - $7,850
-
Tgal
02 2.2136: Install / repair insulation on steam lines $2,560 $1,190 - $2,560
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,350 $1,000 - $3,350
-
MMBtu
-
04 2.2414: Use waste heat from hot flue gases to preheat $3,550 $6,400 - $3,550
-
MMBtu
-
05 2.7144: Install spectral reflectors / delamp $3,530 $9,020 $3,530
58,617
kWh
- -
TOTAL RECOMMENDED $20,840 $18,610 $3,530
58,617
kWh
$9,460
-
MMBtu
$7,850
-
Tgal
TOTAL IMPLEMENTED $13,940 $11,210 $3,530
58,617
kWh
$2,560
-
MMBtu
$7,850
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs