Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,007

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other rubber product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0046 #06 Y:2009 Utilize higher efficiency lamps and/or ballasts $12,295 $23,738
DL0046 #05 Y:2009 Analyze flue gas for proper air/fuel ratio $7,619 $10,000
DL0046 #04 Y:2009 Reduce the pressure of compressed air to the minimum required $4,168 $1,500
DL0046 #03 Y:2009 Insulate bare equipment $7,292 $520
DL0046 #02 Y:2009 Turn off equipment when not in use $2,940 -
DL0046 #01 Y:2009 Turn off equipment when not in use $4,503 -
GT0865 #08 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $69,163 $135,000
GT0865 #07 Y:2009 Utilize higher efficiency lamps and/or ballasts $6,256 $15,290
GT0865 #06 Y:2009 Utilize higher efficiency lamps and/or ballasts $40,450 $84,450
GT0865 #05 Y:2009 Use radiant heater for spot heating $5,208 $8,000
GT0865 #04 Y:2009 Eliminate or reduce compressed air usage $1,003 $1,920
GT0865 #03 Y:2009 Recycle air for heating, ventilation and air conditioning $5,697 $1,100
GT0865 #02 Y:2009 Reduce fluid flow rates $3,226 $1,220
GT0865 #01 Y:2009 Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $23,450 -
GT0853 #10 Y:2008 Utilize higher efficiency lamps and/or ballasts $128,543 $230,470
GT0853 #09 Y:2008 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $148,679 $40,000
GT0853 #08 Y:2008 Replace city water with recycled water via cooling tower $1,629 $2,450
GT0853 #07 Y:2008 Recover heat from exhausted steam, hot air or hot water $10,989 $8,200
GT0853 #06 Y:2008 Use waste heat from hot flue gases to preheat $46,634 $55,500
GT0853 #05 Y:2008 Preheat boiler makeup water with waste process heat $73,789 $34,472