| Assessment Year | 2008 |
|---|---|
| Principal Product | Aerospace Fuel Cells/Iceguard |
| NAICS | 326299: All Other Rubber Product Manufacturing |
| SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 920 |
| Plant Area |
670,000
ft2
|
| Annual Production | 21,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $905,255 | 12,276,474 |
kWh
|
$0.074 |
| Natural Gas | $744,102 | 95,287 |
MMBtu
|
$7.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $452,942 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $171,339 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $6,045 | - | - | - |
$6,045
-
MMBtu
|
- | - | |
| 02 | 2.2628: Utilize a less expensive cooling method | $1,512 | - | - | $1,512 | - | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $27,999 | $4,500 |
$32,999
420,480
kWh
|
- | - | - | $(-5,000.0) | |
| 04 | 2.7291: Reschedule and rearrange multiple-source heating systems | $7,123 | $3,000 |
$(-921.0)
(-12,432)
kWh
|
- |
$8,044
-
MMBtu
|
- | - | |
| 05 | 2.2441: Preheat boiler makeup water with waste process heat | $73,789 | $34,472 | - | - |
$73,789
-
MMBtu
|
- | - | |
| 06 | 2.2414: Use waste heat from hot flue gases to preheat | $46,634 | $55,500 | - | - |
$46,634
-
MMBtu
|
- | - | |
| 07 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $10,989 | $8,200 | - | - |
$10,989
-
MMBtu
|
- | - | |
| 08 | 3.4114: Replace city water with recycled water via cooling tower | $1,629 | $2,450 | - | - | - |
$1,629
-
Tgal
|
- | |
| 09 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $148,679 | $40,000 | - | - |
$148,679
-
MMBtu
|
- | - | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $128,543 | $230,470 |
$128,543
1,637,908
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $452,942 | $378,592 |
$160,621
2,045,956
kWh
|
$1,512 |
$294,180
-
MMBtu
|
$1,629
-
Tgal
|
$(-5,000.0) | ||
| TOTAL IMPLEMENTED | $171,339 | $240,420 |
$160,621
2,045,956
kWh
|
- |
$14,089
-
MMBtu
|
$1,629
-
Tgal
|
$(-5,000.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs