Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

281

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Rubber and plastics hoses and belting manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0330 #12 Y:2024 Repair furnaces and oven doors so that they seal efficiently $529 $1,344
TT0330 #11 Y:2024 Utilize energy-efficient belts and other improved mechanisms $642 $1,400
TT0330 #10 Y:2024 Increase amount of condensate returned $928 $5,000
TT0330 #09 Y:2024 Preheat boiler makeup water with waste process heat $2,928 $11,800
TT0330 #08 Y:2024 Eliminate or reduce compressed air usage $3,319 $3,400
TT0330 #07 Y:2024 Use closed cycle process to minimize waste water production $6,469 $25,000
TT0330 #06 Y:2024 Recover heat from exhausted steam, hot air or hot water $10,702 $50,000
TT0330 #05 Y:2024 Preheat boiler makeup water with waste process heat $11,614 $38,380
TT0330 #04 Y:2024 Turn off equipment when not in use $19,725 $12,000
TT0330 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $25,346 $1,500
TT0330 #02 Y:2024 Install occupancy sensors $30,472 $17,136
TT0330 #01 Y:2024 Use solar heat to make electricty $508,143 $2,436,747
NT0027 #05 Y:2024 Clean or color roof to reduce solar load $4,408 $3,040
NT0027 #04 Y:2024 Optimize plant power factor $2,533 $1,946
NT0027 #03 Y:2024 Lower temperature during the winter season and vice-versa $5,335 -
NT0027 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $4,456 $5,609
NT0027 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,267 $5,347
UU0219 #06 Y:2023 Install isolation transformer on adjustable frequency drive $1,035 $729
UU0219 #05 Y:2023 Turn off equipment when not in use $1,272 $172
UU0219 #04 Y:2023 Use or replace with energy efficient substitutes $1,850 $18,236