Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

196

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Tire manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0085 #03 Y:2012 Use steam pressure reduction to generate power $86,957 $214,808
UA0085 #02 Y:2012 Install / repair insulation on steam lines $164,656 $57,024
UA0085 #01 Y:2012 Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $6,264,801 $14,443,176
MZ0084 #10 Y:2012 Operate boilers on high fire setting $10,918 $1,770
MZ0084 #09 Y:2012 Insulate bare equipment $1,483 $2,500
MZ0084 #08 Y:2012 Eliminate/reduce an operation $6,939 -
MZ0084 #07 Y:2012 Reschedule plant operations or reduce load to avoid peaks $1,142 $1,000
MZ0084 #06 Y:2012 Turn off equipment during breaks, reduce operating time $7,736 $11,730
MZ0084 #05 Y:2012 Install outside air damper / economizer on hvac unit $12,831 $37,520
MZ0084 #04 Y:2012 Utilize outside air instead of conditioned air for drying $1,897 $2,400
MZ0084 #03 Y:2012 Reduce the pressure of compressed air to the minimum required $2,987 $500
MZ0084 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $3,756 $3,500
MZ0084 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $5,602 $15,200
SU0318 #09 Y:2012 Upgrade obsolete equipment $211 $795
SU0318 #08 Y:2012 Conserve energy by efficient use of vending machines $812 $3,107
SU0318 #07 Y:2012 Optimize plant power factor $162,692 $408,153
SU0318 #06 Y:2012 Reduce ventilation air $3,491 $4,419
SU0318 #05 Y:2012 Eliminate/reduce an operation $12,250 $11,115
SU0318 #04 Y:2012 Install vinyl strip / high speed / air curtain doors $106,547 $32,436
SU0318 #03 Y:2012 Make a practice of turning off lights when not needed $72 -