Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,142

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other plastics product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM1004 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $13,554 $125
AM1004 #03 Y:2026 Utilize energy-efficient belts and other improved mechanisms $160 $95
AM1004 #02 Y:2026 Apply for tax-free status for energy purchases $153,709 $15,000
AM1004 #01 Y:2026 Optimize plant power factor $8,060 $19,282
TR0078 #04 Y:2026 Use or replace with energy efficient substitutes $8,985 $44,400
TR0078 #03 Y:2026 Use or replace with energy efficient substitutes $6,640 $12,480
TR0078 #02 Y:2026 Apply for tax-free status for energy purchases $17,418 $2,500
TR0078 #01 Y:2026 Use solar heat to make electricty $87,931 $287,234
MU0091 #12 Y:2026 Pay bills on time to avoid late fees $6,768 -
MU0091 #11 Y:2026 Install timers and/or thermostats $233 $520
MU0091 #10 Y:2026 Lower temperature during the winter season and vice-versa $2,320 -
MU0091 #09 Y:2026 Utilize higher efficiency lamps and/or ballasts $183 $867
MU0091 #08 Y:2026 Install occupancy sensors $243 $1,104
MU0091 #07 Y:2026 Reduce illumination to minimum necessary levels $891 -
MU0091 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,092 $180
MU0091 #05 Y:2026 Reduce the pressure of compressed air to the minimum required $10,362 -
MU0091 #04 Y:2026 Optimize plant power factor $12,469 $38,117
MU0091 #03 Y:2026 Modify startup/shutdown times $31,815 -
MU0091 #02 Y:2026 Replace fossil fuel equipment with electrical equipment $46,437 -
MU0091 #01 Y:2026 Use solar heat to make electricty $58,514 $898,400