Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,980

matching recommendations
$
$
NAICS 32619 Other plastics product manufacturing
ID Description Yearly
Savings
Imp
Cost
UL2501 #09 Y:2025 Lower ceiling to reduce conditioned space $38,672 $8,000
UL2501 #08 Y:2025 Use solar heat to make electricty $95,468 $929,060
UL2501 #07 Y:2025 Optimize plant power factor $25,794 $14,820
UL2501 #06 Y:2025 Use outside cold water source as a supply of cooling water $141,151 $58,367
UL2501 #05 Y:2025 Install occupancy sensors $1,240 $2,661
UL2501 #04 Y:2025 Reduce illumination to minimum necessary levels $592 -
UL2501 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,347 $574
UL2501 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,462 $1,440
UL2501 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $5,472 -
AS0604 #07 Y:2025 Install occupancy sensors $215 $315
AS0604 #06 Y:2025 Install spectral reflectors / delamp $559 $17
AS0604 #05 Y:2025 Install timers on light switches in little used areas $834 $1,268
AS0604 #04 Y:2025 Install compressor air intakes in coolest locations $869 $3,646
AS0604 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,851 $2,568
AS0604 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $28,514 $46,000
AS0604 #01 Y:2025 Use solar heat to make electricty $83,160 $515,135
UD1099 #09 Y:2024 Use solar heat to make electricty $24,032 $480,632
UD1099 #08 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $283 $953
UD1099 #07 Y:2024 Use / purchase optimum sized compressor $1,580 $5,371
UD1099 #06 Y:2024 Install occupancy sensors $2,877 $3,498