Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Plastics pipe, pipe fitting, and unlaminated profile shape manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0048 #07 Y:2010 Eliminate or reduce compressed air usage $62,629 $5,600
MZ0048 #06 Y:2010 Use most efficient type of electric motors $11,307 $5,859
MZ0048 #05 Y:2010 Turn off equipment when not in use $5,639 -
MZ0048 #04 Y:2010 Reduce the pressure of compressed air to the minimum required $3,649 -
MZ0048 #03 Y:2010 Optimize plant power factor $36,058 $92,296
MZ0048 #02 Y:2010 Install compressor air intakes in coolest locations $4,520 $1,160
MZ0048 #01 Y:2010 Reschedule plant operations or reduce load to avoid peaks $12,738 $3,000
OK0767 #08 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $15,751 -
OK0767 #07 Y:2008 Install timers and/or thermostats $46,431 $6,300
OK0767 #06 Y:2008 Use radiant heater for spot heating $81,407 $117,000
OK0767 #05 Y:2008 Begin a practice of predictive / preventative maintenance $2,068 $200
OK0767 #04 Y:2008 Utilize higher efficiency lamps and/or ballasts $2,640 $7,796
OK0767 #03 Y:2008 Utilize higher efficiency lamps and/or ballasts $803 $3,455
OK0767 #02 Y:2008 Utilize higher efficiency lamps and/or ballasts $14,151 $34,635
OK0767 #01 Y:2008 Install / repair insulation on steam lines $14,145 $1,383
OK0742 #05 Y:2006 Insulate bare equipment $2,516 $3,910
OK0742 #04 Y:2006 Use / purchase optimum sized compressor $2,966 $5,529
OK0742 #03 Y:2006 Reschedule plant operations or reduce load to avoid peaks $5,664 $275
OK0742 #02 Y:2006 Recover waste heat from equipment $2,095 $3,851
OK0742 #01 Y:2006 Utilize higher efficiency lamps and/or ballasts $30,095 $79,680