20
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MZ0048 #07 Y:2010 | 07 | 2010 | Eliminate or reduce compressed air usage | $62,629 | $5,600 | |
| MZ0048 #06 Y:2010 | 06 | 2010 | Use most efficient type of electric motors | $11,307 | $5,859 | |
| MZ0048 #05 Y:2010 | 05 | 2010 | Turn off equipment when not in use | $5,639 | - | |
| MZ0048 #04 Y:2010 | 04 | 2010 | Reduce the pressure of compressed air to the minimum required | $3,649 | - | |
| MZ0048 #03 Y:2010 | 03 | 2010 | Optimize plant power factor | $36,058 | $92,296 | |
| MZ0048 #02 Y:2010 | 02 | 2010 | Install compressor air intakes in coolest locations | $4,520 | $1,160 | |
| MZ0048 #01 Y:2010 | 01 | 2010 | Reschedule plant operations or reduce load to avoid peaks | $12,738 | $3,000 | |
| OK0767 #08 Y:2008 | 08 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $15,751 | - | |
| OK0767 #07 Y:2008 | 07 | 2008 | Install timers and/or thermostats | $46,431 | $6,300 | |
| OK0767 #06 Y:2008 | 06 | 2008 | Use radiant heater for spot heating | $81,407 | $117,000 | |
| OK0767 #05 Y:2008 | 05 | 2008 | Begin a practice of predictive / preventative maintenance | $2,068 | $200 | |
| OK0767 #04 Y:2008 | 04 | 2008 | Utilize higher efficiency lamps and/or ballasts | $2,640 | $7,796 | |
| OK0767 #03 Y:2008 | 03 | 2008 | Utilize higher efficiency lamps and/or ballasts | $803 | $3,455 | |
| OK0767 #02 Y:2008 | 02 | 2008 | Utilize higher efficiency lamps and/or ballasts | $14,151 | $34,635 | |
| OK0767 #01 Y:2008 | 01 | 2008 | Install / repair insulation on steam lines | $14,145 | $1,383 | |
| OK0742 #05 Y:2006 | 05 | 2006 | Insulate bare equipment | $2,516 | $3,910 | |
| OK0742 #04 Y:2006 | 04 | 2006 | Use / purchase optimum sized compressor | $2,966 | $5,529 | |
| OK0742 #03 Y:2006 | 03 | 2006 | Reschedule plant operations or reduce load to avoid peaks | $5,664 | $275 | |
| OK0742 #02 Y:2006 | 02 | 2006 | Recover waste heat from equipment | $2,095 | $3,851 | |
| OK0742 #01 Y:2006 | 01 | 2006 | Utilize higher efficiency lamps and/or ballasts | $30,095 | $79,680 |