ITAC Assessment: OK0742
ITAC logo
ITAC Assessment: OK0742
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product vehicle floor liners
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area 160,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,180 4,744,800
kWh
Electricity Demand $40,019 14,478
kW-mo/yr
Electricity Fees $77,525 -
Natural Gas $2,748 409
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,336 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,180

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $30,095 $79,680 $27,558
555,610
kWh
$2,537
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $2,095 $3,851 - - $2,095
-
MMBtu
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,664 $275 - $5,664
-
kW-mo/yr
-
04 2.4226: Use / purchase optimum sized compressor $2,966 $5,529 $1,361
27,440
kWh
$1,605
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $2,516 $3,910 $2,516
43,376
kWh
- -
TOTAL RECOMMENDED $43,336 $93,245 $31,435
626,426
kWh
$9,806
-
kW-mo/yr
$2,095
-
MMBtu
TOTAL IMPLEMENTED $8,180 $4,185 $2,516
43,376
kWh
$5,664
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs