ITAC Assessment: WV0235
ITAC logo
ITAC Assessment: WV0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Cans, Can Parts, Can Bodies
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 175,000
ft2
Annual Production 120,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $483,927 6,308,000
kWh
Natural Gas $68,066 10,392
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,581 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $15,241 $1,875 $15,241
198,651
kWh
- - -
02 2.2628: Utilize a less expensive cooling method $1,124 $525 $1,124
14,650
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,006 $3,100 $5,006
65,251
kWh
- - -
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $9,017 $750 $9,017
121,302
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $5,013 $444 $5,013
65,412
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $7,512 $125 $7,512
97,909
kWh
- - -
07 3.5316: Contract a wood pallet recycling company $2,700 $100 - - $2,700
-
lb
-
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,968 $2,500 - $6,968
-
Tgal
- -
09 4.652: Replace existing equipment with more suitable substitutes $14,000 $6,000 - - - $14,000
TOTAL RECOMMENDED $66,581 $15,419 $42,913
563,175
kWh
$6,968
-
Tgal
$2,700
-
lb
$14,000
TOTAL IMPLEMENTED $40,600 $6,475 $37,900
497,763
kWh
- $2,700
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings