matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
MU0067 #14 Y:2025 | 14 | 2025 | Lower temperature during the winter season and vice-versa | $56 | - |
n/a
|
MU0067 #13 Y:2025 | 13 | 2025 | Utilize higher efficiency lamps and/or ballasts | $416 | $137 |
n/a
|
MU0067 #12 Y:2025 | 12 | 2025 | Install occupancy sensors | $215 | $134 |
n/a
|
MU0067 #11 Y:2025 | 11 | 2025 | Use photocell controls | $101 | $237 |
n/a
|
MU0067 #10 Y:2025 | 10 | 2025 | Install timers on light switches in little used areas | $188 | $178 |
n/a
|
MU0067 #09 Y:2025 | 09 | 2025 | Make a practice of turning off lights when not needed | $35 | - |
n/a
|
MU0067 #08 Y:2025 | 08 | 2025 | Reduce illumination to minimum necessary levels | $407 | - |
n/a
|
MU0067 #07 Y:2025 | 07 | 2025 | Turn off equipment during breaks, reduce operating time | $134 | - |
n/a
|
MU0067 #06 Y:2025 | 06 | 2025 | Use or replace with energy efficient substitutes | $353 | $1,040 |
n/a
|
MU0067 #05 Y:2025 | 05 | 2025 | Install compressor air intakes in coolest locations | $2,362 | $1,305 |
n/a
|
MU0067 #04 Y:2025 | 04 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $1,601 | $1,185 |
n/a
|
MU0067 #03 Y:2025 | 03 | 2025 | Install / repair insulation on steam lines | $145 | $1,463 |
n/a
|
MU0067 #02 Y:2025 | 02 | 2025 | Reduce heat gain by window tinting | $1,837 | $7,217 |
n/a
|
MU0067 #01 Y:2025 | 01 | 2025 | Replace existing hvac unit with high efficiency model | $41,259 | $236,478 |
n/a
|
WM0236 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,254 | $1,975 | |
WM0236 #02 Y:2024 | 02 | 2024 | Reduce the pressure of compressed air to the minimum required | $15,581 | - | |
WM0236 #01 Y:2024 | 01 | 2024 | Use cooling tower water instead of refrigeration | $16,468 | $142,500 | |
UA0290 #08 Y:2024 | 08 | 2024 | Install occupancy sensors | $348 | $452 |
n/a
|
UA0290 #07 Y:2024 | 07 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $224 | $224 |
n/a
|
UA0290 #06 Y:2024 | 06 | 2024 | Preheat boiler makeup water with waste process heat | $10,563 | $56,271 |
n/a
|