Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

945

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Plastics pipe, pipe fitting, and unlaminated profile shape manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0067 #14 Y:2025 Lower temperature during the winter season and vice-versa $56 -
MU0067 #13 Y:2025 Utilize higher efficiency lamps and/or ballasts $416 $137
MU0067 #12 Y:2025 Install occupancy sensors $215 $134
MU0067 #11 Y:2025 Use photocell controls $101 $237
MU0067 #10 Y:2025 Install timers on light switches in little used areas $188 $178
MU0067 #09 Y:2025 Make a practice of turning off lights when not needed $35 -
MU0067 #08 Y:2025 Reduce illumination to minimum necessary levels $407 -
MU0067 #07 Y:2025 Turn off equipment during breaks, reduce operating time $134 -
MU0067 #06 Y:2025 Use or replace with energy efficient substitutes $353 $1,040
MU0067 #05 Y:2025 Install compressor air intakes in coolest locations $2,362 $1,305
MU0067 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,601 $1,185
MU0067 #03 Y:2025 Install / repair insulation on steam lines $145 $1,463
MU0067 #02 Y:2025 Reduce heat gain by window tinting $1,837 $7,217
MU0067 #01 Y:2025 Replace existing hvac unit with high efficiency model $41,259 $236,478
WM0236 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,254 $1,975
WM0236 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $15,581 -
WM0236 #01 Y:2024 Use cooling tower water instead of refrigeration $16,468 $142,500
UA0290 #08 Y:2024 Install occupancy sensors $348 $452
UA0290 #07 Y:2024 Utilize energy-efficient belts and other improved mechanisms $224 $224
UA0290 #06 Y:2024 Preheat boiler makeup water with waste process heat $10,563 $56,271