Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

537

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Unlaminated plastics film and sheet (except packaging) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0344 #05 Y:2004 Use photocell controls $1,795 $6,164
UF0344 #04 Y:2004 Reduce the pressure of compressed air to the minimum required $2,898 -
UF0344 #03 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $2,950 $490
UF0344 #02 Y:2004 Turn off equipment when not in use $11,821 -
UF0344 #01 Y:2004 Use waste heat from hot flue gases to preheat $21,466 $60,000
MS0250 #09 Y:2004 Utilize higher efficiency lamps and/or ballasts $404 $1,038
MS0250 #08 Y:2004 Utilize higher efficiency lamps and/or ballasts $427 $901
MS0250 #07 Y:2004 Install timers and/or thermostats $553 $472
MS0250 #06 Y:2004 Use most efficient type of electric motors $1,169 $3,310
MS0250 #05 Y:2004 Air condition only space necessary $1,335 $600
MS0250 #04 Y:2004 Reduce illumination to minimum necessary levels $1,826 $81
MS0250 #03 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $3,222 $258
MS0250 #02 Y:2004 Utilize energy-efficient belts and other improved mechanisms $5,198 $2,253
MS0250 #01 Y:2004 Utilize higher efficiency lamps and/or ballasts $8,405 $9,114
BD0248 #17 Y:2003 Automate payroll system $936 $2,500
BD0248 #16 Y:2003 Use power during off-peak periods $7,578 $2,000
BD0248 #15 Y:2003 Install equipment to move product $28,938 $3,000
BD0248 #14 Y:2003 Minimize water usage $287 $460
BD0248 #13 Y:2003 Use synthetic lubricant $74 $200
BD0248 #12 Y:2003 Use photocell controls $363 $225