ITAC Assessment: MS0250
ITAC logo
ITAC Assessment: MS0250
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Plastic Bags
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 68,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,040 4,361,880
kWh
Electricity Demand $28,226 6,176
kW-mo/yr
Electricity Fees $51,711 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,539 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,405 $9,114 $5,515
165,451
kWh
$791
-
kW-mo/yr
$2,099
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,198 $2,253 $3,410
102,307
kWh
$490
-
kW-mo/yr
$1,298
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,222 $258 $2,387
71,601
kWh
- $835
04 2.7111: Reduce illumination to minimum necessary levels $1,826 $81 $1,198
35,951
kWh
$172
-
kW-mo/yr
$456
05 2.7229: Air condition only space necessary $1,335 $600 $581
17,420
kWh
$455
-
kW-mo/yr
$299
06 2.4133: Use most efficient type of electric motors $1,169 $3,310 $866
25,972
kWh
- $303
07 2.7261: Install timers and/or thermostats $553 $472 $410
12,287
kWh
- $143
08 2.7142: Utilize higher efficiency lamps and/or ballasts $427 $901 $279
8,361
kWh
$42
-
kW-mo/yr
$106
09 2.7142: Utilize higher efficiency lamps and/or ballasts $404 $1,038 $265
7,940
kWh
$39
-
kW-mo/yr
$100
TOTAL RECOMMENDED $22,539 $18,027 $14,911
447,290
kWh
$1,989
-
kW-mo/yr
$5,639
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs