ITAC Assessment: MS0139
ITAC logo
ITAC Assessment: MS0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Acoustic Ceiling Tiles
NAICS
n/a
SIC 3296: Mineral Wool
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 450,000
ft2
Annual Production 190,000
thousand feet
Production Hrs. Annual 7,728
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $545,468 20,776,378
kWh
Electricity Demand $184,032 40,896
kW-mo/yr
Electricity Fees $80,024 -
Natural Gas $1,923,657 668,353
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,835 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,182

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (haz) Savings Ancillary Material Cost Savings
01 2.7134: Use photocell controls $3,484 $490 $694
106,975
kWh
$788
-
kW-mo/yr
$2,002 - - -
02 2.7261: Install timers and/or thermostats $219 $591 $57
8,792
kWh
- $162 - - -
03 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $61,739 $26,241 - - - $61,739
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,224 $554 $1,610
247,948
kWh
- $4,614 - - -
05 3.7198: Reduce / eliminate use of disposable product $169 $574 - - - - $1
-
lb
$168
TOTAL RECOMMENDED $71,835 $28,450 $2,361
363,715
kWh
$788
-
kW-mo/yr
$6,778 $61,739
-
MMBtu
$1
-
lb
$168
TOTAL IMPLEMENTED $68,182 $27,386 $1,667
256,740
kWh
- $4,776 $61,739
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs