ITAC Assessment: WI0064
ITAC logo
ITAC Assessment: WI0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PICKLES,TOMATOES(PROCESSED)
NAICS
n/a
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area
n/a
Annual Production 67,000,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $220,538 3,243,259
kWh
Natural Gas $53,294 15,553
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $148,001 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,070

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $98,647 $400,000 $115,602
1,699,883
kWh
$(-16,955.0)
-
MMBtu
02 2.7226: Use computer programs to optimize hvac performance $16,875 $1,500 $16,875
248,242
kWh
-
03 2.2621: Modify refrigeration system to operate at a lower pressure $16,709 - $16,709
245,604
kWh
-
04 2.8113: Purchase gas directly from a contract gas supplier $13,766 - - $13,766
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $803 $5,000 - $803
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $304 $419 $304
4,396
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $533 $500 - $533
-
MMBtu
08 2.6218: Turn off equipment when not in use $364 $800 - $364
-
MMBtu
TOTAL RECOMMENDED $148,001 $408,219 $149,490
2,198,125
kWh
$(-1,489.0)
-
MMBtu
TOTAL IMPLEMENTED $14,070 $419 $304
4,396
kWh
$13,766
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs