| Assessment Year | 1989 |
|---|---|
| Principal Product | PICKLES,TOMATOES(PROCESSED) |
| NAICS |
n/a
|
| SIC | 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings |
| Sales Range | $10 M to 50M |
| # of Employees | 215 |
| Plant Area |
n/a
|
| Annual Production | 67,000,000
lb
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $220,538 | 3,243,259 |
kWh
|
$0.068 |
| Natural Gas | $53,294 | 15,553 |
MMBtu
|
$3.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $148,001 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,070 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $98,647 | $400,000 |
$115,602
1,699,883
kWh
|
$(-16,955.0)
-
MMBtu
|
|
| 02 | 2.7226: Use computer programs to optimize hvac performance | $16,875 | $1,500 |
$16,875
248,242
kWh
|
- | |
| 03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $16,709 | - |
$16,709
245,604
kWh
|
- | |
| 04 | 2.8113: Purchase gas directly from a contract gas supplier | $13,766 | - | - |
$13,766
-
MMBtu
|
|
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $803 | $5,000 | - |
$803
-
MMBtu
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $304 | $419 |
$304
4,396
kWh
|
- | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $533 | $500 | - |
$533
-
MMBtu
|
|
| 08 | 2.6218: Turn off equipment when not in use | $364 | $800 | - |
$364
-
MMBtu
|
|
| TOTAL RECOMMENDED | $148,001 | $408,219 |
$149,490
2,198,125
kWh
|
$(-1,489.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $14,070 | $419 |
$304
4,396
kWh
|
$13,766
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs