ITAC Assessment: UD0319
ITAC logo
ITAC Assessment: UD0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CUSTOM INJECTION MOLDING
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 79
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $313,177 6,595,252
kWh
Natural Gas $9,314 2,509
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,310

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $10,147 - $12,584
308,030
kWh
$(-2,437.0)
-
MMBtu
02 2.3191: Use demand controller or load shedder $1,320 - $1,320
-
kWh
-
03 2.6242: Minimize operation of equipment maintained in standby condition $13,053 - $13,053
287,515
kWh
-
04 2.4322: Use or replace with energy efficient substitutes $20,790 - $20,790
405,627
kWh
-
TOTAL RECOMMENDED $45,310 - $47,747
1,001,172
kWh
$(-2,437.0)
-
MMBtu
TOTAL IMPLEMENTED $45,310 - $47,747
1,001,172
kWh
$(-2,437.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs