ITAC Assessment: UD1126
ITAC logo
ITAC Assessment: UD1126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Electrical Components for Automotive Vehicles
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 181
Plant Area 200,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,568
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $658,359 9,943,844
kWh
Electricity Demand $134,647 15,809
kW-mo/yr
Electricity Fees $3,652 -
Natural Gas $46,814 2,276
MMBtu
Waste Disposal Costs
Water Usage $35,529 4,939
Tgal
Water Disposal $11,526 4,282
Tgal
Other Liquid (non-haz) $8,429 1
gal
TOTAL YEARLY COSTS $898,956
RECOMMENDED SAVINGS* $45,211 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.8114: Change rate schedules or other changes in utility service $32,372 - - $32,372
-
MMBtu
-
02 3.4116: Meter recycled water (to reduce sewer charges) $9,848 $2,500 - - $9,848
-
Tgal
03 2.8123: Pay utility bills on time $2,991 - $1,551 $1,440
-
MMBtu
-
TOTAL RECOMMENDED $45,211 $2,500 $1,551 $33,812
-
MMBtu
$9,848
-
Tgal
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs