ITAC Assessment: AS0478
ITAC logo
ITAC Assessment: AS0478
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Cement/Ready Mix
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 2,000
ft2
Annual Production 6,000
units
Production Hrs. Annual 3,333
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,989 341,200
kWh
Electricity Demand $71,194 4,388
kW-mo/yr
Electricity Fees $7,659 -
TOTAL YEARLY COSTS $105,842
RECOMMENDED SAVINGS* $65,851 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,283

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $25,716 $2,242 - - $25,716
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,212 $45,350 $12,627
126,265
kWh
$3,585
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $13,813 $447 $12,379
123,785
kWh
$1,434
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $7,543 $27,245 $6,417
64,167
kWh
$1,126
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,567 $2,918 $2,000
19,998
kWh
$567
-
kW-mo/yr
-
TOTAL RECOMMENDED $65,851 $78,202 $33,423
334,215
kWh
$6,712
-
kW-mo/yr
$25,716
TOTAL IMPLEMENTED $28,283 $5,160 $2,000
19,998
kWh
$567
-
kW-mo/yr
$25,716
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs