ITAC Assessment: BD0248
ITAC logo
ITAC Assessment: BD0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Plastic Sheet and Rollstock
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 44,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 8,520
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $320,473 10,267,200
kWh
Electricity Demand $189,604 17,462
kW-mo/yr
Natural Gas $15,535 2,187
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,766 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,351

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $48,696 $13,832 n/a $48,696
979,512
kWh
- - - - - -
02 2.4239: Eliminate or reduce compressed air usage $12,672 $24,600 n/a $6,640
263,489
kWh
$6,032
-
kW-mo/yr
- - - - -
03 2.4133: Use most efficient type of electric motors $11,140 $23,175 $7,726
306,382
kWh
$3,414
-
kW-mo/yr
- - - - -
04 2.7231: Use radiant heater for spot heating $4,072 $5,000 - - $4,072
-
MMBtu
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,847 $4,555 $2,005
79,544
kWh
$1,183
-
kW-mo/yr
- - $209 - $450
06 2.4221: Install compressor air intakes in coolest locations $2,760 $1,000 $1,704
67,632
kWh
$1,056
-
kW-mo/yr
- - - - -
07 2.7111: Reduce illumination to minimum necessary levels $1,613 $450 $894
35,478
kWh
$528
-
kW-mo/yr
- - $16 - $175
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,492 - $938
37,221
kWh
$554
-
kW-mo/yr
- - - - -
09 2.7135: Install occupancy sensors $1,196 $1,575 $512
20,409
kWh
$590
-
kW-mo/yr
- - $19 - $75
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $663 $600 $222
19,800
kWh
$441
-
kW-mo/yr
- - - - -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $439 $175 $306
12,191
kWh
$133
-
kW-mo/yr
- - - - -
12 2.7134: Use photocell controls $363 $225 $152
6,044
kWh
$185
-
kW-mo/yr
- - $13 - $13
13 2.4314: Use synthetic lubricant $74 $200 $47
1,846
kWh
$27
-
kW-mo/yr
- - - - -
14 3.4151: Minimize water usage $287 $460 - - - $287
-
Tgal
- - -
15 4.445: Install equipment to move product $28,938 $3,000 - - - - $28,938 - -
16 2.3137: Use power during off-peak periods $7,578 $2,000 - - - - - $7,578 -
17 4.447: Automate payroll system $936 $2,500 - - - - $936 - -
TOTAL RECOMMENDED $126,766 $83,347 $69,842
1,829,548
kWh
$14,143
-
kW-mo/yr
$4,072
-
MMBtu
$287
-
Tgal
$30,131 $7,578 $713
TOTAL IMPLEMENTED $53,351 $37,505 $12,901
522,770
kWh
$6,781
-
kW-mo/yr
$4,072
-
MMBtu
- $29,147 - $450
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings