ITAC Assessment: SF0439
ITAC logo
ITAC Assessment: SF0439
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Paper Cups and Plastic Lids
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 452,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,355,870 19,406,067
kWh
Electricity Demand $430,421 34,729
kW-mo/yr
Electricity Fees $10,353 -
Natural Gas $114,492 16,176
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $194,257 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $123,597

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,213 - $7,213
103,228
kWh
- - -
02 2.2511: Insulate bare equipment $3,654 $436 $2,713
38,824
kWh
$941
-
kW-mo/yr
- -
03 2.4322: Use or replace with energy efficient substitutes $34,286 $4,843 $25,935
371,194
kWh
$8,351
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $620 $359 $455
6,517
kWh
$165
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $52,879 $35,000 $46,613
667,135
kWh
$6,266
-
kW-mo/yr
- -
06 2.4239: Eliminate or reduce compressed air usage $15,908 $12,499 $12,799
183,189
kWh
$3,109
-
kW-mo/yr
- -
07 2.7144: Install spectral reflectors / delamp $3,902 $3,286 $2,626
37,580
kWh
$1,276
-
kW-mo/yr
- -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,037 $10,104 $7,271
104,069
kWh
$1,766
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,058 $18,484 $10,058
143,951
kWh
- - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,646 $8,690 $2,129
30,466
kWh
$517
-
kW-mo/yr
- -
11 2.7135: Install occupancy sensors $6,030 $22,132 $4,852
69,446
kWh
$1,178
-
kW-mo/yr
- -
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,184 $91,986 $19,457
278,481
kWh
$4,727
-
kW-mo/yr
- -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $4,151 $18,136 $3,415
48,882
kWh
$551
-
kW-mo/yr
$222 $(-37.0)
14 2.6218: Turn off equipment when not in use $370 $1,980 $370
5,301
kWh
- - -
15 2.2628: Utilize a less expensive cooling method $19,319 $118,398 $15,815
226,343
kWh
$3,504
-
kW-mo/yr
- -
TOTAL RECOMMENDED $194,257 $346,333 $161,721
2,314,606
kWh
$32,351
-
kW-mo/yr
$222 $(-37.0)
TOTAL IMPLEMENTED $123,597 $63,241 $102,999
1,474,156
kWh
$20,598
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs