Assessment Year | 2004 |
---|---|
Principal Product | Plastic sheets and slabs for fabrication |
NAICS | 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
155,000
ft2
|
Annual Production | 25,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $442,333 | 8,673,200 |
kWh
|
$0.051 |
Electricity Demand | $127,034 | 14,403 |
kW-mo/yr
|
$8.82 |
Natural Gas | $80,246 | 9,056 |
MMBtu
|
$8.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,016 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,950 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $21,466 | $60,000 | - |
$21,466
-
MMBtu
|
- | - | |
02 | 2.6218: Turn off equipment when not in use | $11,821 | - |
$11,821
231,775
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,950 | $490 |
$2,986
58,545
kWh
|
- | - | $(-36.0) | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,898 | - |
$2,898
43,908
kWh
|
- | - | - | |
05 | 2.7134: Use photocell controls | $1,795 | $6,164 |
$1,795
27,192
kWh
|
- | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $1,470 | $150 |
$1,470
22,272
kWh
|
- | - | - | |
07 | 3.4155: Meter waste water | $2,616 | $1,500 | - | - |
$2,616
-
Tgal
|
- | |
TOTAL RECOMMENDED | $45,016 | $68,304 |
$20,970
383,692
kWh
|
$21,466
-
MMBtu
|
$2,616
-
Tgal
|
$(-36.0) | ||
TOTAL IMPLEMENTED | $2,950 | $490 |
$2,986
58,545
kWh
|
- | - | $(-36.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs