ITAC Assessment: UF0344
ITAC logo
ITAC Assessment: UF0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Plastic sheets and slabs for fabrication
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 155,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $442,333 8,673,200
kWh
Electricity Demand $127,034 14,403
kW-mo/yr
Natural Gas $80,246 9,056
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,016 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,950

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $21,466 $60,000 - $21,466
-
MMBtu
- -
02 2.6218: Turn off equipment when not in use $11,821 - $11,821
231,775
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,950 $490 $2,986
58,545
kWh
- - $(-36.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,898 - $2,898
43,908
kWh
- - -
05 2.7134: Use photocell controls $1,795 $6,164 $1,795
27,192
kWh
- - -
06 2.7111: Reduce illumination to minimum necessary levels $1,470 $150 $1,470
22,272
kWh
- - -
07 3.4155: Meter waste water $2,616 $1,500 - - $2,616
-
Tgal
-
TOTAL RECOMMENDED $45,016 $68,304 $20,970
383,692
kWh
$21,466
-
MMBtu
$2,616
-
Tgal
$(-36.0)
TOTAL IMPLEMENTED $2,950 $490 $2,986
58,545
kWh
- - $(-36.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs