ITAC Assessment: OK0596
ITAC logo
ITAC Assessment: OK0596
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Tubes
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 200,000
ft2
Annual Production 70,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $356,028 14,338,804
kWh
Electricity Demand $190,662 31,890
kW-mo/yr
Natural Gas $930,521 295,682
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,112 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $299 $1,360 $299
10,551
kWh
- - - - -
02 2.7111: Reduce illumination to minimum necessary levels $3,864 $345 $3,098
114,596
kWh
$766
-
kW-mo/yr
- - - -
03 4.125: $6,879 - - - - - - $6,879
04 2.2135: Repair and eliminate steam leaks $17,180 $800 $12,917
520,223
kWh
$4,263
-
kW-mo/yr
- - - -
05 2.2414: Use waste heat from hot flue gases to preheat $4,687 $5,722 - - $4,687
-
MMBtu
- - -
06 3.5311: Recover and reuse waste material $17,603 $6,000 - - - $17,603
-
Tgal
- -
07 4.441: Install automatic packing equipment $87,600 $110,000 - - - - $87,600 -
TOTAL RECOMMENDED $138,112 $124,227 $16,314
645,370
kWh
$5,029
-
kW-mo/yr
$4,687
-
MMBtu
$17,603
-
Tgal
$87,600 $6,879
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs