530
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Unlaminated plastics film and sheet (except packaging) manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UC2405 #08 Y:2024 | 08 | 2024 | Insulate bare equipment | $410 | $1,310 |
n/a
|
UC2405 #07 Y:2024 | 07 | 2024 | Replace existing hvac unit with high efficiency model | $4,288 | $31,098 |
n/a
|
UC2405 #06 Y:2024 | 06 | 2024 | Install timers and/or thermostats | $1,409 | $1,997 |
n/a
|
UC2405 #05 Y:2024 | 05 | 2024 | Use solar heat to make electricty | $30,199 | $266,755 |
n/a
|
UC2405 #04 Y:2024 | 04 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,198 | $1,300 |
n/a
|
UC2405 #03 Y:2024 | 03 | 2024 | Utilize controls to operate equipment only when needed | $1,826 | $30 |
n/a
|
UC2405 #02 Y:2024 | 02 | 2024 | Optimize plant power factor | $3,906 | $30,482 |
n/a
|
UC2405 #01 Y:2024 | 01 | 2024 | Pay utility bills on time | $299 | - |
n/a
|
UW2403 #08 Y:2024 | 08 | 2024 | Use / purchase optimum sized compressor | $24,078 | $36,400 |
n/a
|
UW2403 #07 Y:2024 | 07 | 2024 | Use radiant heater for spot heating | $8,794 | $58,500 |
n/a
|
UW2403 #06 Y:2024 | 06 | 2024 | Upgrade obsolete equipment | $6,846 | $30,000 |
n/a
|
UW2403 #05 Y:2024 | 05 | 2024 | Install timers and/or thermostats | $1,319 | $720 |
n/a
|
UW2403 #04 Y:2024 | 04 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $17,988 | $1,080 |
n/a
|
UW2403 #03 Y:2024 | 03 | 2024 | Level two – install control system using iiot devices with communication capabilities to store data to the cloud | $222,893 | $500,000 |
n/a
|
UW2403 #02 Y:2024 | 02 | 2024 | Utilize higher efficiency lamps and/or ballasts | $3,147 | $4,257 |
n/a
|
UW2403 #01 Y:2024 | 01 | 2024 | Insulate bare equipment | $8,480 | $4,010 |
n/a
|
UD1071 #06 Y:2023 | 06 | 2023 | Utilize controls to operate equipment only when needed | $60,417 | $127,158 | |
UD1071 #05 Y:2023 | 05 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,111 | $952 | |
UD1071 #04 Y:2023 | 04 | 2023 | Eliminate or reduce compressed air usage | $1,651 | $1,800 | |
UD1071 #03 Y:2023 | 03 | 2023 | Reduce the pressure of compressed air to the minimum required | $1,691 | - |