Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,182

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Plastics packaging materials and unlaminated film and sheet manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0481 #05 Y:2013 Develop a repair/replace policy $3,317 $381
WV0481 #04 Y:2013 Shift from daytime to nighttime operation $5,404 -
WV0481 #03 Y:2013 Establish a predictive maintenance program $10,571 $1,000
WV0481 #02 Y:2013 Utilize a less expensive cooling method $14,611 $72,000
WV0481 #01 Y:2013 Utilize higher efficiency lamps and/or ballasts $19,697 $36,851
AM0652 #09 Y:2013 Use photocell controls $150 -
AM0652 #08 Y:2013 Utilize daylight whenever possible in lieu of artificial light $320 -
AM0652 #07 Y:2013 Reduce the pressure of compressed air to the minimum required $740 $20
AM0652 #06 Y:2013 Install skylights $1,040 $3,790
AM0652 #05 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $2,195 $500
AM0652 #04 Y:2013 Use most efficient type of electric motors $5,680 $30,600
AM0652 #03 Y:2013 Utilize higher efficiency lamps and/or ballasts $5,965 $5,090
AM0652 #02 Y:2013 Optimize plant power factor $14,900 $37,100
AM0652 #01 Y:2013 Insulate bare equipment $91,770 $1,500
LE0373 #10 Y:2013 Install compressor air intakes in coolest locations $1,395 $4,250
LE0373 #09 Y:2013 Replace existing hvac unit with high efficiency model $681 $1,400
LE0373 #08 Y:2013 Utilize higher efficiency lamps and/or ballasts $4,176 $4,410
LE0373 #07 Y:2013 Replace boiler $93,869 $72,460
LE0373 #06 Y:2013 Preheat combustion air with waste heat $9,750 $6,900
LE0373 #05 Y:2013 Utilize energy-efficient belts and other improved mechanisms $3,652 $2,400