Assessment Year | 2014 |
---|---|
Principal Product | rigid plastic film |
NAICS | 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
75,000
ft2
|
Annual Production | 46,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $585,867 | 14,577,300 |
kWh
|
$0.040 |
Electricity Demand | $377,115 | 28,880 |
kW-mo/yr
|
$13.06 |
Natural Gas | $44,131 | 5,776 |
MMBtu
|
$7.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $60,283 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,424 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,697 | $36,851 |
$13,650
337,699
kWh
|
$6,047
-
kW-mo/yr
|
- | - | |
02 | 2.2628: Utilize a less expensive cooling method | $14,611 | $72,000 |
$10,131
250,633
kWh
|
$4,480
-
kW-mo/yr
|
- | - | |
03 | 2.4157: Establish a predictive maintenance program | $10,571 | $1,000 |
$8,209
203,089
kWh
|
$3,631
-
kW-mo/yr
|
- | $(-1,269.0) | |
04 | 2.3134: Shift from daytime to nighttime operation | $5,404 | - | - |
$6,028
-
kW-mo/yr
|
- | $(-624.0) | |
05 | 2.4151: Develop a repair/replace policy | $3,317 | $381 |
$2,519
62,311
kWh
|
$1,110
-
kW-mo/yr
|
- | $(-312.0) | |
06 | 2.2511: Insulate bare equipment | $3,285 | $4,251 | - | - |
$3,285
-
MMBtu
|
- | |
07 | 2.2437: Recover waste heat from equipment | $2,147 | $2,480 | - | - |
$2,147
-
MMBtu
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $794 | $1,293 |
$546
13,500
kWh
|
$248
-
kW-mo/yr
|
- | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $457 | $13 |
$313
7,754
kWh
|
$144
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $60,283 | $118,269 |
$35,368
874,986
kWh
|
$21,688
-
kW-mo/yr
|
$5,432
-
MMBtu
|
$(-2,205.0) | ||
TOTAL IMPLEMENTED | $18,424 | $6,938 |
$11,587
286,654
kWh
|
$5,133
-
kW-mo/yr
|
$3,285
-
MMBtu
|
$(-1,581.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs