ITAC Assessment: WV0481
ITAC logo
ITAC Assessment: WV0481
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product rigid plastic film
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 75,000
ft2
Annual Production 46,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $585,867 14,577,300
kWh
Electricity Demand $377,115 28,880
kW-mo/yr
Natural Gas $44,131 5,776
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,283 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,424

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,697 $36,851 $13,650
337,699
kWh
$6,047
-
kW-mo/yr
- -
02 2.2628: Utilize a less expensive cooling method $14,611 $72,000 $10,131
250,633
kWh
$4,480
-
kW-mo/yr
- -
03 2.4157: Establish a predictive maintenance program $10,571 $1,000 $8,209
203,089
kWh
$3,631
-
kW-mo/yr
- $(-1,269.0)
04 2.3134: Shift from daytime to nighttime operation $5,404 - - $6,028
-
kW-mo/yr
- $(-624.0)
05 2.4151: Develop a repair/replace policy $3,317 $381 $2,519
62,311
kWh
$1,110
-
kW-mo/yr
- $(-312.0)
06 2.2511: Insulate bare equipment $3,285 $4,251 - - $3,285
-
MMBtu
-
07 2.2437: Recover waste heat from equipment $2,147 $2,480 - - $2,147
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $794 $1,293 $546
13,500
kWh
$248
-
kW-mo/yr
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $457 $13 $313
7,754
kWh
$144
-
kW-mo/yr
- -
TOTAL RECOMMENDED $60,283 $118,269 $35,368
874,986
kWh
$21,688
-
kW-mo/yr
$5,432
-
MMBtu
$(-2,205.0)
TOTAL IMPLEMENTED $18,424 $6,938 $11,587
286,654
kWh
$5,133
-
kW-mo/yr
$3,285
-
MMBtu
$(-1,581.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs