55
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1071 #06 Y:2023 | 06 | 2023 | Utilize controls to operate equipment only when needed | $60,417 | $127,158 | |
| UD1071 #05 Y:2023 | 05 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,111 | $952 | |
| UD1071 #04 Y:2023 | 04 | 2023 | Eliminate or reduce compressed air usage | $1,651 | $1,800 | |
| UD1071 #03 Y:2023 | 03 | 2023 | Reduce the pressure of compressed air to the minimum required | $1,691 | - | |
| UD1071 #02 Y:2023 | 02 | 2023 | Install compressor air intakes in coolest locations | $1,777 | $1,275 | |
| UD1071 #01 Y:2023 | 01 | 2023 | Eliminate or reduce compressed air usage | $19,375 | $11,280 | |
| UD1055 #10 Y:2023 | 10 | 2023 | Optimize plant power factor | $13,546 | $36,036 | |
| UD1055 #09 Y:2023 | 09 | 2023 | Meter recycled water (to reduce sewer charges) | $8,276 | $296 | |
| UD1055 #08 Y:2023 | 08 | 2023 | Utilize higher efficiency lamps and/or ballasts | $1,013 | $2,835 | |
| UD1055 #07 Y:2023 | 07 | 2023 | Utilize higher efficiency lamps and/or ballasts | $2,617 | $4,189 | |
| UD1055 #06 Y:2023 | 06 | 2023 | Install occupancy sensors | $4,478 | $2,800 | |
| UD1055 #05 Y:2023 | 05 | 2023 | Eliminate or reduce compressed air usage | $499 | $675 | |
| UD1055 #04 Y:2023 | 04 | 2023 | Turn off equipment when not in use | $716 | - | |
| UD1055 #03 Y:2023 | 03 | 2023 | Substitute compressed air cooling with water or air cooling | $4,980 | $600 | |
| UD1055 #02 Y:2023 | 02 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,342 | $952 | |
| UD1055 #01 Y:2023 | 01 | 2023 | Turn off equipment during breaks, reduce operating time | $109,446 | - | |
| UD1054 #11 Y:2023 | 11 | 2023 | Replace hydraulic / pneumatic equipment with electric equipment | $1,768,755 | $300,000 | |
| UD1054 #10 Y:2023 | 10 | 2023 | Optimize plant power factor | $1,467 | $7,400 | |
| UD1054 #09 Y:2023 | 09 | 2023 | Utilize higher efficiency lamps and/or ballasts | $3,823 | $44,209 | |
| UD1054 #08 Y:2023 | 08 | 2023 | Utilize higher efficiency lamps and/or ballasts | $933 | $7,594 |