Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Plastics packaging materials and unlaminated film and sheet manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1071 #06 Y:2023 Utilize controls to operate equipment only when needed $60,417 $127,158
UD1071 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,111 $952
UD1071 #04 Y:2023 Eliminate or reduce compressed air usage $1,651 $1,800
UD1071 #03 Y:2023 Reduce the pressure of compressed air to the minimum required $1,691 -
UD1071 #02 Y:2023 Install compressor air intakes in coolest locations $1,777 $1,275
UD1071 #01 Y:2023 Eliminate or reduce compressed air usage $19,375 $11,280
UD1055 #10 Y:2023 Optimize plant power factor $13,546 $36,036
UD1055 #09 Y:2023 Meter recycled water (to reduce sewer charges) $8,276 $296
UD1055 #08 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,013 $2,835
UD1055 #07 Y:2023 Utilize higher efficiency lamps and/or ballasts $2,617 $4,189
UD1055 #06 Y:2023 Install occupancy sensors $4,478 $2,800
UD1055 #05 Y:2023 Eliminate or reduce compressed air usage $499 $675
UD1055 #04 Y:2023 Turn off equipment when not in use $716 -
UD1055 #03 Y:2023 Substitute compressed air cooling with water or air cooling $4,980 $600
UD1055 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $9,342 $952
UD1055 #01 Y:2023 Turn off equipment during breaks, reduce operating time $109,446 -
UD1054 #11 Y:2023 Replace hydraulic / pneumatic equipment with electric equipment $1,768,755 $300,000
UD1054 #10 Y:2023 Optimize plant power factor $1,467 $7,400
UD1054 #09 Y:2023 Utilize higher efficiency lamps and/or ballasts $3,823 $44,209
UD1054 #08 Y:2023 Utilize higher efficiency lamps and/or ballasts $933 $7,594