ITAC Assessment: UD1071
ITAC logo
ITAC Assessment: UD1071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Heavy Gauge Custom Plastic Sheeting
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $50
M
to 100
M
# of Employees 93
Plant Area 72,000
ft2
Annual Production 54,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $582,251 13,171,200
kWh
Electricity Demand $387,947 25,142
kW-mo/yr
Electricity Fees $1,662 -
Natural Gas $56,406 5,192
MMBtu
Waste Disposal Costs
Water Usage $86,375 3,036
Tgal
Water Disposal $5,311 644
Tgal
Other Liquid (non-haz) $10,058 1
gal
TOTAL YEARLY COSTS $1,130,010
RECOMMENDED SAVINGS* $86,022 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,137

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4239: Eliminate or reduce compressed air usage $19,375 $11,280 $19,375
438,359
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,777 $1,275 $1,202
27,199
kWh
$575
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,691 - $1,144
25,873
kWh
$547
-
kW-mo/yr
04 2.4239: Eliminate or reduce compressed air usage $1,651 $1,800 $1,651
37,363
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,111 $952 $740
17,535
kWh
$371
-
kW-mo/yr
06 2.6231: Utilize controls to operate equipment only when needed $60,417 $127,158 $30,877
698,584
kWh
$29,540
-
kW-mo/yr
TOTAL RECOMMENDED $86,022 $142,465 $54,989
1,244,913
kWh
$31,033
-
kW-mo/yr
TOTAL IMPLEMENTED $22,137 $14,032 $21,766
493,257
kWh
$371
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs