ITAC Assessment: LS2009
ITAC logo
ITAC Assessment: LS2009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 26
Plant Area 30,000
ft2
Annual Production 8,500
bbl
Production Hrs. Annual 4,368
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,936 564,024
kWh
Natural Gas $34,602 3,928
MMBtu
Waste Disposal Costs
Water Usage $6,000 491
Tgal
TOTAL YEARLY COSTS $101,538
RECOMMENDED SAVINGS* $66,699 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,671

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.2694: Use highest temperature for chilling or cold storage $209 $13 $209
1,936
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,136 $360 $3,136
29,023
kWh
- -
03 2.4239: Eliminate or reduce compressed air usage $155 $25 $155
1,432
kWh
- -
04 2.7124: Make a practice of turning off lights when not needed $71 $50 $71
659
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $69 $88 $69
643
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,426 $2,260 $1,426
13,200
kWh
- -
07 4.441: Install automatic packing equipment $57,969 $120,000 $(-7,551.0)
(-69,888)
kWh
- $65,520
08 2.2414: Use waste heat from hot flue gases to preheat $3,664 $14,000 - $3,664
-
MMBtu
-
TOTAL RECOMMENDED $66,699 $136,796 $(-2,485.0)
(-22,995)
kWh
$3,664
-
MMBtu
$65,520
TOTAL IMPLEMENTED $62,671 $122,758 $(-2,849.0)
(-26,363)
kWh
- $65,520
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs