48
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CC0018 #06 Y:2023 | 06 | 2023 | Replace fossil fuel equipment with electrical equipment | $95,279 | $350,000 |
n/a
|
| CC0018 #05 Y:2023 | 05 | 2023 | Use cooling tower water instead of refrigeration | $16,265 | $70,000 |
n/a
|
| CC0018 #04 Y:2023 | 04 | 2023 | Reduce the pressure of compressed air to the minimum required | $2,300 | - |
n/a
|
| CC0018 #03 Y:2023 | 03 | 2023 | Eliminate or reduce compressed air usage | $5,158 | $10,000 |
n/a
|
| CC0018 #02 Y:2023 | 02 | 2023 | Recover waste heat from equipment | $31,506 | $10,000 |
n/a
|
| CC0018 #01 Y:2023 | 01 | 2023 | Insulate feedwater tank | $2,497 | $500 |
n/a
|
| NC0299 #07 Y:2004 | 07 | 2004 | Shut off pilots in standby equipment | $895 | $2,195 | |
| NC0299 #06 Y:2004 | 06 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $373 | $100 | |
| NC0299 #05 Y:2004 | 05 | 2004 | Recover waste heat from equipment | $3,382 | $9,255 | |
| NC0299 #04 Y:2004 | 04 | 2004 | Utilize higher efficiency lamps and/or ballasts | $1,143 | $1,622 | |
| NC0299 #03 Y:2004 | 03 | 2004 | Develop a repair/replace policy | $1,352 | $1,030 | |
| NC0299 #02 Y:2004 | 02 | 2004 | Change rate schedules or other changes in utility service | $38,998 | $1,000 | |
| NC0299 #01 Y:2004 | 01 | 2004 | Add equipment/ operators to reduce production bottleneck | $418,000 | $275,000 | |
| NC0269 #07 Y:2003 | 07 | 2003 | Initiate a total quality management program | $14,907 | $640 | |
| NC0269 #06 Y:2003 | 06 | 2003 | Reschedule plant operations or reduce load to avoid peaks | $3,654 | $2,400 | |
| NC0269 #05 Y:2003 | 05 | 2003 | Reduce illumination to minimum necessary levels | $7,908 | $800 | |
| NC0269 #04 Y:2003 | 04 | 2003 | Develop a repair/replace policy | $4,027 | $1,719 | |
| NC0269 #03 Y:2003 | 03 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $14,974 | $9,174 | |
| NC0269 #02 Y:2003 | 02 | 2003 | Insulate bare equipment | $16,965 | $5,128 | |
| NC0269 #01 Y:2003 | 01 | 2003 | Install refrigeration system to cool product | $272,200 | $118,250 |