Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Plastics packaging materials and unlaminated film and sheet manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CC0018 #06 Y:2023 Replace fossil fuel equipment with electrical equipment $95,279 $350,000
CC0018 #05 Y:2023 Use cooling tower water instead of refrigeration $16,265 $70,000
CC0018 #04 Y:2023 Reduce the pressure of compressed air to the minimum required $2,300 -
CC0018 #03 Y:2023 Eliminate or reduce compressed air usage $5,158 $10,000
CC0018 #02 Y:2023 Recover waste heat from equipment $31,506 $10,000
CC0018 #01 Y:2023 Insulate feedwater tank $2,497 $500
NC0299 #07 Y:2004 Shut off pilots in standby equipment $895 $2,195
NC0299 #06 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $373 $100
NC0299 #05 Y:2004 Recover waste heat from equipment $3,382 $9,255
NC0299 #04 Y:2004 Utilize higher efficiency lamps and/or ballasts $1,143 $1,622
NC0299 #03 Y:2004 Develop a repair/replace policy $1,352 $1,030
NC0299 #02 Y:2004 Change rate schedules or other changes in utility service $38,998 $1,000
NC0299 #01 Y:2004 Add equipment/ operators to reduce production bottleneck $418,000 $275,000
NC0269 #07 Y:2003 Initiate a total quality management program $14,907 $640
NC0269 #06 Y:2003 Reschedule plant operations or reduce load to avoid peaks $3,654 $2,400
NC0269 #05 Y:2003 Reduce illumination to minimum necessary levels $7,908 $800
NC0269 #04 Y:2003 Develop a repair/replace policy $4,027 $1,719
NC0269 #03 Y:2003 Utilize energy-efficient belts and other improved mechanisms $14,974 $9,174
NC0269 #02 Y:2003 Insulate bare equipment $16,965 $5,128
NC0269 #01 Y:2003 Install refrigeration system to cool product $272,200 $118,250