ITAC Assessment: NC0299
ITAC logo
ITAC Assessment: NC0299
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product plastic bagging and sheeting
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area 80,000
ft2
Annual Production 34,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $268,791 10,086,600
kWh
Electricity Demand $208,632 22,188
kW-mo/yr
Electricity Fees $15,907 -
Natural Gas $17,717 2,106
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $464,143 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $460,761

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $418,000 $275,000 - - - - $(-2,000.0) - $420,000
02 2.8114: Change rate schedules or other changes in utility service $38,998 $1,000 - $38,998
-
kW-mo/yr
- - - - -
03 2.4151: Develop a repair/replace policy $1,352 $1,030 $911
34,235
kWh
$441
-
kW-mo/yr
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,143 $1,622 $770
28,953
kWh
$373
-
kW-mo/yr
- - - - -
05 2.2437: Recover waste heat from equipment $3,382 $9,255 $2,427
91,250
kWh
$955
-
kW-mo/yr
- - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $373 $100 $548
20,586
kWh
$265
-
kW-mo/yr
- $(-240.0) - $(-200.0) -
07 2.6214: Shut off pilots in standby equipment $895 $2,195 - - $631
-
MMBtu
- $264 - -
TOTAL RECOMMENDED $464,143 $290,202 $4,656
175,024
kWh
$41,032
-
kW-mo/yr
$631
-
MMBtu
$(-240.0) $(-1,736.0) $(-200.0) $420,000
TOTAL IMPLEMENTED $460,761 $280,947 $2,229
83,774
kWh
$40,077
-
kW-mo/yr
$631
-
MMBtu
$(-240.0) $(-1,736.0) $(-200.0) $420,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs