Assessment Year | 2003 |
---|---|
Principal Product | Plastic grocery bags and plastic sheeting |
NAICS | 326111: Plastics Bag and Pouch Manufacturing |
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
82,400
ft2
|
Annual Production | 4,300,000,000
pieces
|
Production Hrs. Annual | 8,600
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $867,779 | 32,086,500 |
kWh
|
$0.027 |
Electricity Demand | $814,527 | 50,575 |
kW-mo/yr
|
$16.11 |
Electricity Fees | $413 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $334,635 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $311,820 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.113: Install refrigeration system to cool product | $272,200 | $118,250 | - | - | - | $(-5,000.0) | $277,200 | |
02 | 2.2511: Insulate bare equipment | $16,965 | $5,128 |
$8,353
308,224
kWh
|
$8,612
-
kW-mo/yr
|
- | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $14,974 | $9,174 |
$8,192
303,410
kWh
|
$6,782
-
kW-mo/yr
|
- | - | - | |
04 | 2.4151: Develop a repair/replace policy | $4,027 | $1,719 |
$2,208
81,490
kWh
|
$1,819
-
kW-mo/yr
|
- | - | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $7,908 | $800 |
$4,368
161,184
kWh
|
$3,540
-
kW-mo/yr
|
- | - | - | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,654 | $2,400 |
$(-18.0)
(-667)
kWh
|
$3,672
-
kW-mo/yr
|
- | - | - | |
07 | 4.711: Initiate a total quality management program | $14,907 | $640 |
$8,695
320,865
kWh
|
$8,132
-
kW-mo/yr
|
$(-1,920.0) | - | - | |
TOTAL RECOMMENDED | $334,635 | $138,111 |
$31,798
1,174,506
kWh
|
$32,557
-
kW-mo/yr
|
$(-1,920.0) | $(-5,000.0) | $277,200 | ||
TOTAL IMPLEMENTED | $311,820 | $136,671 |
$18,735
692,457
kWh
|
$20,885
-
kW-mo/yr
|
- | $(-5,000.0) | $277,200 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs