Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,379

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Plastics product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0249 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $1,131 -
WM0249 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,396 $4,125
WM0249 #03 Y:2025 Install compressor air intakes in coolest locations $1,484 $2,740
WM0249 #02 Y:2025 Lower temperature during the winter season and vice-versa $2,929 -
WM0249 #01 Y:2025 Reduce space conditioning during non-working hours $3,470 -
WM0248 #04 Y:2025 Recharge batteries on during off-peak demand periods $1,542 -
WM0248 #03 Y:2025 Upgrade controls on compressors $2,386 $3,535
WM0248 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $6,724 -
WM0248 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $22,211 $20,406
NL0122 #07 Y:2025 Reschedule plant operations or reduce load to avoid peaks $931 $90
NL0122 #06 Y:2025 Change rate schedules or other changes in utility service $1,242 $120
NL0122 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,650 $12,200
NL0122 #04 Y:2025 Turn off equipment when not in use $5,864 $120
NL0122 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $5,944 $13,202
NL0122 #02 Y:2025 Optimize plant power factor $10,000 $15,600
NL0122 #01 Y:2025 Use waste heat from hot flue gases to preheat $58,962 $417,000
WV0694 #06 Y:2025 Eliminate or reduce compressed air usage $333 $359
WV0694 #05 Y:2025 Install occupancy sensors $361 $500
WV0694 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $398 $700
WV0694 #03 Y:2025 Upgrade controls on compressors $425 $1,975