Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,147

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Plastics product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1099 #09 Y:2024 Use solar heat to make electricty $24,032 $480,632
UD1099 #08 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $283 $953
UD1099 #07 Y:2024 Use / purchase optimum sized compressor $1,580 $5,371
UD1099 #06 Y:2024 Install occupancy sensors $2,877 $3,498
UD1099 #05 Y:2024 Change rate schedules or other changes in utility service $2,633 $1,322
UD1099 #04 Y:2024 Reduce space conditioning during non-working hours $568 -
UD1099 #03 Y:2024 Keep doors and windows shut when not on use $1,162 -
UD1099 #02 Y:2024 Close holes and openings in building such as broken windows $2,105 -
UD1099 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $4,391 -
SJ0030 #08 Y:2024 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $663 $4,755
SJ0030 #07 Y:2024 Reduce the pressure of compressed air to the minimum required $4,287 -
SJ0030 #06 Y:2024 Modify refrigeration system to operate at a lower pressure $70,368 $30,719
SJ0030 #05 Y:2024 Turn off equipment when not in use $136 $1,200
SJ0030 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $15,245 -
SJ0030 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $15,538 $18,930
SJ0030 #02 Y:2024 Use battery storage for demand control $18,627 $195,217
SJ0030 #01 Y:2024 Use solar heat to make electricty $630,866 $6,247,450
GT0990 #07 Y:2024 Use solar heat to make electricty $205,570 $6,145,720
GT0990 #06 Y:2024 Optimize plant power factor $2,014 $8,907
GT0990 #05 Y:2024 Eliminate or reduce compressed air usage $1,140 $3,000