Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,291

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Plastics product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0258 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $2,565 $200
DL0258 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $5,102 $3,500
DL0258 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $12,808 $25,000
DL0258 #01 Y:2025 Install occupancy sensors $2,112 $5,500
UL2504 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $601 $2,445
UL2504 #07 Y:2025 Reschedule plant operations or reduce load to avoid peaks $4,512 -
UL2504 #06 Y:2025 Upgrade obsolete equipment $17,226 $135,000
UL2504 #05 Y:2025 Use solar heat to make electricty $18,944 $219,965
UL2504 #04 Y:2025 Optimize plant power factor $45,536 $20,280
UL2504 #03 Y:2025 Use outside cold water source as a supply of cooling water $10,447 $57,490
UL2504 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,017 $630
UL2504 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $223 $168
IC0326 #10 Y:2025 Lower temperature during the winter season and vice-versa $93 -
IC0326 #09 Y:2025 Recharge batteries on during off-peak demand periods $941 -
IC0326 #08 Y:2025 Utilize a less expensive cooling method $15,398 $114,881
IC0326 #07 Y:2025 Insulate bare equipment $2,266 $2,982
IC0326 #06 Y:2025 Use demand controller or load shedder $657 $3,632
IC0326 #05 Y:2025 Use or replace with energy efficient substitutes $393 $1,089
IC0326 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,819 $678
IC0326 #03 Y:2025 Eliminate or reduce compressed air usage $2,821 $4,859