Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,179

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Plastics and rubber products manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0699 #10 Y:2026 Eliminate or reduce compressed air usage $830 $962
WV0699 #09 Y:2026 Reduce the pressure of compressed air to the minimum required $1,006 $200
WV0699 #08 Y:2026 Install set-back timers $1,060 $1,250
WV0699 #07 Y:2026 Eliminate or reduce compressed air usage $1,117 $221
WV0699 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,298 $5,700
WV0699 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,454 $1,704
WV0699 #04 Y:2026 Insulate bare equipment $3,455 $1,276
WV0699 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,173 $756
WV0699 #02 Y:2026 Upgrade controls on compressors $5,185 $3,635
WV0699 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $15,816 $25,580
MU0091 #12 Y:2026 Pay bills on time to avoid late fees $6,768 -
MU0091 #11 Y:2026 Install timers and/or thermostats $233 $520
MU0091 #10 Y:2026 Lower temperature during the winter season and vice-versa $2,320 -
MU0091 #09 Y:2026 Utilize higher efficiency lamps and/or ballasts $183 $867
MU0091 #08 Y:2026 Install occupancy sensors $243 $1,104
MU0091 #07 Y:2026 Reduce illumination to minimum necessary levels $891 -
MU0091 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,092 $180
MU0091 #05 Y:2026 Reduce the pressure of compressed air to the minimum required $10,362 -
MU0091 #04 Y:2026 Optimize plant power factor $12,469 $38,117
MU0091 #03 Y:2026 Modify startup/shutdown times $31,815 -