Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other miscellaneous chemical product and preparation manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2610 #09 Y:2026 Use solar heat to make electricty $11,783 $116,051
UL2610 #08 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,565 $11,013
UL2610 #07 Y:2026 Install occupancy sensors $102 $386
UL2610 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,253 $315
UL2610 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $9,804 $19,530
UL2610 #04 Y:2026 Optimize plant power factor $5,290 $27,000
UL2610 #03 Y:2026 Reschedule plant operations or reduce load to avoid peaks $6,056 -
UL2610 #02 Y:2026 Insulate bare equipment $2,011 $1,050
UL2610 #01 Y:2026 Re-size charging openings or add a movable door on equipment $286 $200
UL2301 #05 Y:2023 Adopt in-house material generation $85,200 $50,198
UL2301 #04 Y:2023 Reschedule plant operations or reduce load to avoid peaks $8,944 -
UL2301 #03 Y:2023 Use solar heat to make electricty $33,531 $260,163
UL2301 #02 Y:2023 Optimize plant power factor $5,141 $9,184
UL2301 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $3,408 $2,832
UK1705 #15 Y:2017 Use only certified motor repair shops $1,601 $2,117
UK1705 #14 Y:2017 Utilize energy-efficient belts and other improved mechanisms $18,931 -
UK1705 #13 Y:2017 Eliminate or reduce compressed air usage $690 $870
UK1705 #12 Y:2017 Install compressor air intakes in coolest locations $9,503 $2,284
UK1705 #11 Y:2017 Turn off equipment when not in use $63,938 -
UK1705 #10 Y:2017 Use photocell controls $1,504 $3,570