ITAC Assessment: UL2301
ITAC logo
ITAC Assessment: UL2301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Nanowire and Nanowire materials
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 19,022
ft2
Annual Production 165,347
lb
Production Hrs. Annual 3,200
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,515 334,155
kWh
Electricity Demand $54,156 2,267
kW-mo/yr
Electricity Fees $15,472 -
Natural Gas $8,662 745
MMBtu
TOTAL YEARLY COSTS $95,805
RECOMMENDED SAVINGS* $136,224 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,408

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,408 $2,832 $906
17,414
kWh
$2,502
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $5,141 $9,184 - - $5,141 -
03 2.9114: Use solar heat to make electricty $33,531 $260,163 $17,369
334,026
kWh
$16,162
-
kW-mo/yr
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,944 - - $8,944
-
kW-mo/yr
- -
05 4.212: Adopt in-house material generation $85,200 $50,198 - - - $85,200
TOTAL RECOMMENDED $136,224 $322,377 $18,275
351,440
kWh
$27,608
-
kW-mo/yr
$5,141 $85,200
TOTAL IMPLEMENTED $3,408 $2,832 $906
17,414
kWh
$2,502
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs