39
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Custom compounding of purchased resins | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IP0203 #06 Y:2024 | 06 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $2,835 | $1,480 | |
| IP0203 #05 Y:2024 | 05 | 2024 | Use demand controller or load shedder | $64,223 | $20,000 | |
| IP0203 #04 Y:2024 | 04 | 2024 | Install compressor air intakes in coolest locations | $10,015 | $1,072 | |
| IP0203 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,564 | $44 | |
| IP0203 #02 Y:2024 | 02 | 2024 | Install automatic stack damper | $55,966 | $1,300 | |
| IP0203 #01 Y:2024 | 01 | 2024 | Use automatic flow control | $56,666 | $700 | |
| UD0753 #13 Y:2006 | 13 | 2006 | Upgrade controls on compressors | $299 | $3,800 | |
| UD0753 #12 Y:2006 | 12 | 2006 | Optimize plant power factor | $864 | $9,000 | |
| UD0753 #11 Y:2006 | 11 | 2006 | Use optimum temperature | $998 | - | |
| UD0753 #10 Y:2006 | 10 | 2006 | Reduce the pressure of compressed air to the minimum required | $1,007 | - | |
| UD0753 #09 Y:2006 | 09 | 2006 | Reduce illumination to minimum necessary levels | $1,816 | - | |
| UD0753 #08 Y:2006 | 08 | 2006 | Use heat in flue gases to preheat products or materials | $5,105 | $16,500 | |
| UD0753 #07 Y:2006 | 07 | 2006 | Use closed cycle process to minimize waste water production | $8,390 | $15,000 | |
| UD0753 #06 Y:2006 | 06 | 2006 | Use radiant heater for spot heating | $10,800 | $15,600 | |
| UD0753 #05 Y:2006 | 05 | 2006 | Insulate bare equipment | $11,994 | $7,875 | |
| UD0753 #04 Y:2006 | 04 | 2006 | Use plant owned transformers or lease transformers | $35,807 | $30,000 | |
| UD0753 #03 Y:2006 | 03 | 2006 | Reduce ventilation air | $36,200 | $10,000 | |
| UD0753 #02 Y:2006 | 02 | 2006 | Reduce ventilation air | $67,600 | $19,800 | |
| UD0753 #01 Y:2006 | 01 | 2006 | Develop standard operating procedures | $98,450 | $3,040 | |
| BD0246 #20 Y:2003 | 20 | 2003 | Purchase material from supplier in customized packaging | $11,550 | $1,000 |