ITAC Assessment: BD0246
ITAC logo
ITAC Assessment: BD0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Extruded Rollstock and Thermoformed Containers
NAICS 325991: Custom Compounding of Purchased Resins
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $10
M
to 50
M
# of Employees 104
Plant Area 145,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,417 19,455,864
kWh
Electricity Demand $569,386 35,370
kW-mo/yr
Natural Gas $11,611 1,602
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $490,559 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,883

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4224: Upgrade controls on compressors $24,786 $15,000 $4,357
389,059
kWh
$20,429
-
kW-mo/yr
- - - - -
02 2.4133: Use most efficient type of electric motors $9,982 $31,690 $4,028
359,412
kWh
$5,954
-
kW-mo/yr
- - - - -
03 2.7124: Make a practice of turning off lights when not needed $7,990 $15,285 $2,814
251,264
kWh
$3,302
-
kW-mo/yr
- - - $1,874 -
04 2.4239: Eliminate or reduce compressed air usage $7,890 $200 $2,657
237,219
kWh
$5,233
-
kW-mo/yr
- - - - -
05 2.2443: Re-use or recycle hot or cold process exhaust air $5,102 $3,000 - - $5,102
-
MMBtu
- - - -
06 2.4221: Install compressor air intakes in coolest locations $5,063 $1,000 $1,705
152,297
kWh
$3,358
-
kW-mo/yr
- - - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $4,552 - $1,533
136,899
kWh
$3,019
-
kW-mo/yr
- - - - -
08 2.7144: Install spectral reflectors / delamp $4,085 $600 $745
66,466
kWh
$1,464
-
kW-mo/yr
- - - $378 $1,498
09 2.7135: Install occupancy sensors $4,013 $4,200 $1,220
108,898
kWh
$2,793
-
kW-mo/yr
- - - - -
10 2.2511: Insulate bare equipment $3,886 $290 $3,886
95,281
kWh
- - - - - -
11 2.7231: Use radiant heater for spot heating $2,694 $3,000 - - $2,694
-
MMBtu
- - - -
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,724 $500 $580
51,821
kWh
$1,144
-
kW-mo/yr
- - - - -
13 2.4314: Use synthetic lubricant $935 $500 $315
28,113
kWh
$620
-
kW-mo/yr
- - - - -
14 2.7134: Use photocell controls $519 $500 $75
6,716
kWh
$444
-
kW-mo/yr
- - - - -
15 2.7142: Utilize higher efficiency lamps and/or ballasts $249 $322 $37
3,329
kWh
$74
-
kW-mo/yr
- - - $58 $80
16 3.5212: Regrind, reuse, or sell scrap plastic parts $36,500 $1,000 - - - - $36,500
-
lb
- -
17 3.4151: Minimize water usage $841 $1,150 - - - $841
-
gal
- - -
18 3.5316: Contract a wood pallet recycling company $760 $288 - - - - $760
-
lb
- -
19 4.441: Install automatic packing equipment $357,438 $90,000 - - - - - $357,438 -
20 4.213: Purchase material from supplier in customized packaging $11,550 $1,000 - - - - - - $11,550
TOTAL RECOMMENDED $490,559 $169,525 $23,952
1,886,774
kWh
$47,834
-
kW-mo/yr
$7,796
-
MMBtu
$841
-
gal
$37,260
-
lb
$359,748 $13,128
TOTAL IMPLEMENTED $57,883 $48,680 $18,746
1,421,988
kWh
$39,137
-
kW-mo/yr
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs