ITAC Assessment: UD0753
ITAC logo
ITAC Assessment: UD0753
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Engineered Plastic
NAICS 325991: Custom Compounding of Purchased Resins
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 122,000
ft2
Annual Production 7,750
ton
Production Hrs. Annual 8,568
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,885 9,798,253
kWh
Electricity Demand $243,864 17,304
kW-mo/yr
Natural Gas $263,217 23,558
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $279,330 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $200,048

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 4.625: Develop standard operating procedures $98,450 $3,040 - - - - - $98,450
02 2.7314: Reduce ventilation air $67,600 $19,800 $6,500
341,400
kWh
$7,300
-
kW-mo/yr
- $53,800
-
MMBtu
- -
03 2.7314: Reduce ventilation air $36,200 $10,000 $4,600
244,200
kWh
- - $31,600
-
MMBtu
- -
04 2.3511: Use plant owned transformers or lease transformers $35,807 $30,000 - - $35,807 - - -
05 2.2511: Insulate bare equipment $11,994 $7,875 $5,812
305,878
kWh
$6,182
-
kW-mo/yr
- - - -
06 2.7231: Use radiant heater for spot heating $10,800 $15,600 - - - $10,800
-
MMBtu
- -
07 3.4111: Use closed cycle process to minimize waste water production $8,390 $15,000 - - - - $8,390
-
Tgal
-
08 2.2424: Use heat in flue gases to preheat products or materials $5,105 $16,500 - - - $5,105
-
MMBtu
- -
09 2.7111: Reduce illumination to minimum necessary levels $1,816 - $880
46,267
kWh
$936
-
kW-mo/yr
- - - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $1,007 - $488
25,704
kWh
$519
-
kW-mo/yr
- - - -
11 2.2211: Use optimum temperature $998 - $998
52,536
kWh
- - - - -
12 2.3212: Optimize plant power factor $864 $9,000 - - $864 - - -
13 2.4224: Upgrade controls on compressors $299 $3,800 $145
7,626
kWh
$154
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $279,330 $130,615 $19,423
1,023,611
kWh
$15,091
-
kW-mo/yr
$36,671 $101,305
-
MMBtu
$8,390
-
Tgal
$98,450
TOTAL IMPLEMENTED $200,048 $61,315 $14,190
746,081
kWh
$14,418
-
kW-mo/yr
- $64,600
-
MMBtu
$8,390
-
Tgal
$98,450
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs