ITAC Assessment: SD0253
ITAC logo
ITAC Assessment: SD0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product aluminum castings
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $5
M
to 10
M
# of Employees 130
Plant Area 72,000
ft2
Annual Production 420,000
lb
Production Hrs. Annual 4,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,022 2,001,172
kWh
Electricity Demand $85,634 7,197
kW-mo/yr
Electricity Fees $4,483 -
Natural Gas $98,479 27,583
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $179,961 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $108,760 $68,000 $74,190
1,141,852
kWh
$53,264
-
kW-mo/yr
$(-18,694.0)
-
MMBtu
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,706 $15,000 $5,801
89,390
kWh
$10,195
-
kW-mo/yr
$(-1,290.0)
-
MMBtu
- -
03 2.4323: Use optimum size and capacity equipment $20,080 $25,000 - - $20,080
-
MMBtu
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,561 $12,000 $8,561
131,887
kWh
- - - -
05 2.2414: Use waste heat from hot flue gases to preheat $2,622 $7,000 - - $2,622
-
MMBtu
- -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,732 $5,400 - - - $2,732
-
lb
-
07 4.424: Improve space comfort conditioning $22,500 $15,000 - - - - $22,500
TOTAL RECOMMENDED $179,961 $147,400 $88,552
1,363,129
kWh
$63,459
-
kW-mo/yr
$2,718
-
MMBtu
$2,732
-
lb
$22,500
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs