Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Clinical Diagnostics
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 500,000
ft2
Annual Production 4,000
units
Production Hrs. Annual 2,730
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $680,177 12,720,155
kWh
Electricity Demand $378,270 21,975
kW-mo/yr
Electricity Fees $175,310 -
Waste Disposal Costs
Water Usage $99,351 10,707
Tgal
Water Disposal $59,644 4,370
Tgal
TOTAL YEARLY COSTS $1,392,752
RECOMMENDED SAVINGS* $604,284 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,964

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $281,585 $342,472 $194,878
3,676,935
kWh
$86,707
-
kW-mo/yr
- -
02 2.7229: Air condition only space necessary $92,381 $7,860 $63,875
1,205,191
kWh
$28,506
-
kW-mo/yr
- -
03 2.7221: Lower temperature during the winter season and vice-versa $61,330 $1,580 $25,955
489,709
kWh
$35,375
-
kW-mo/yr
- -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $51,887 $23,900 $35,912
677,581
kWh
$15,975
-
kW-mo/yr
- -
05 2.8114: Change rate schedules or other changes in utility service $49,124 $120 - - - $49,124
06 2.7224: Reduce space conditioning during non-working hours $47,137 $1,580 $47,137
889,381
kWh
- - -
07 3.4116: Meter recycled water (to reduce sewer charges) $11,466 $1,492 - - $11,466
-
Tgal
-
08 2.6218: Turn off equipment when not in use $6,009 - $6,009
113,371
kWh
- - -
09 2.7135: Install occupancy sensors $2,695 $1,365 $2,695
50,851
kWh
- - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $670 $1,980 $463
8,742
kWh
$207
-
kW-mo/yr
- -
TOTAL RECOMMENDED $604,284 $382,349 $376,924
7,111,761
kWh
$166,770
-
kW-mo/yr
$11,466
-
Tgal
$49,124
TOTAL IMPLEMENTED $69,964 $4,957 $9,167
172,964
kWh
$207
-
kW-mo/yr
$11,466
-
Tgal
$49,124
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs