Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

190

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Custom compounding of purchased resins
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0203 #06 Y:2024 Utilize energy-efficient belts and other improved mechanisms $2,835 $1,480
IP0203 #05 Y:2024 Use demand controller or load shedder $64,223 $20,000
IP0203 #04 Y:2024 Install compressor air intakes in coolest locations $10,015 $1,072
IP0203 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $4,564 $44
IP0203 #02 Y:2024 Install automatic stack damper $55,966 $1,300
IP0203 #01 Y:2024 Use automatic flow control $56,666 $700
TT0294 #11 Y:2023 Reduce space conditioning during non-working hours $88 $100
TT0294 #10 Y:2023 Turn off equipment during breaks, reduce operating time $974 $500
TT0294 #09 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,938 $40
TT0294 #08 Y:2023 Install compressor air intakes in coolest locations $3,236 $7,500
TT0294 #07 Y:2023 Use solar heat for heat $4,761 $15,950
TT0294 #06 Y:2023 Change rate schedules or other changes in utility service $4,671 $500
TT0294 #05 Y:2023 Air condition only space necessary $6,563 $18,000
TT0294 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $13,950 $3,100
TT0294 #03 Y:2023 Provide proper maintenance of motor driven equipment $14,815 $12,000
TT0294 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $15,944 $43,883
TT0294 #01 Y:2023 Begin a practice of predictive / preventative maintenance $77,940 $2,000
TT0289 #06 Y:2023 Use / purchase optimum sized compressor $61,137 $119,000
TT0289 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $1,719 $1,609
TT0289 #04 Y:2023 Recover waste heat from equipment $13,798 $13,000