Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other chemical product and preparation manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0463 #04 Y:2018 Turn off equipment during breaks, reduce operating time $19,392 $30,000
LE0463 #03 Y:2018 Use or replace with energy efficient substitutes $6,825 $7,525
LE0463 #02 Y:2018 Replace existing hvac unit with high efficiency model $53,879 $30,500
LE0463 #01 Y:2018 Reduce the pressure of compressed air to the minimum required $1,239 $70
WV0382 #15 Y:2008 Utilize higher efficiency lamps and/or ballasts $766 $3,539
WV0382 #14 Y:2008 Utilize higher efficiency lamps and/or ballasts $902 -
WV0382 #13 Y:2008 Reduce the pressure of compressed air to the minimum required $1,076 $31
WV0382 #12 Y:2008 Install outside air damper / economizer on hvac unit $1,884 $3,093
WV0382 #11 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $3,016 $195
WV0382 #10 Y:2008 Use waste heat from flue gases to heat space conditioning air $3,383 $4,160
WV0382 #09 Y:2008 Establish a predictive maintenance program $4,240 $1,000
WV0382 #08 Y:2008 Establish a preventative maintenance program $4,689 $996
WV0382 #07 Y:2008 Recover waste heat from equipment $5,784 $224
WV0382 #06 Y:2008 Repair faulty insulation in furnaces, boilers, etc $9,768 $3,213
WV0382 #05 Y:2008 Use steam pressure reduction to generate power $11,112 $100,800
WV0382 #04 Y:2008 Use waste heat from hot flue gases to preheat $14,388 $8,615
WV0382 #03 Y:2008 Use waste heat from hot flue gases to preheat $18,966 $8,615
WV0382 #02 Y:2008 Establish equipment maintenance schedule $109,212 $38,900
WV0382 #01 Y:2008 Repair or replace steam traps $165,919 $5,500
WV0346 #09 Y:2006 Install compressor air intakes in coolest locations $534 $131