| Assessment Year | 2008 |
|---|---|
| Principal Product | BHT, MBMC Anti-oxidants |
| NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
| SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 36 |
| Plant Area |
200,000
ft2
|
| Annual Production | 2,500,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $304,899 | 6,584,767 |
kWh
|
$0.046 |
| Electricity Demand | $60,077 | 10,095 |
kW-mo/yr
|
$5.95 |
| Electricity Fees | $3,852 | - |
|
- |
| Natural Gas | $1,583,617 | 189,209 |
MMBtu
|
$8.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $355,105 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $295,348 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2113: Repair or replace steam traps | $165,919 | $5,500 | - | - |
$173,979
-
MMBtu
|
$(-8,060.0) | |
| 02 | 2.6124: Establish equipment maintenance schedule | $109,212 | $38,900 | - | - |
$109,212
-
MMBtu
|
- | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $18,966 | $8,615 | - | - |
$18,966
-
MMBtu
|
- | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $14,388 | $8,615 | - | - |
$14,388
-
MMBtu
|
- | |
| 05 | 2.3321: Use steam pressure reduction to generate power | $11,112 | $100,800 |
$6,114
613,200
kWh
|
$4,998
-
kW-mo/yr
|
- | - | |
| 06 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $9,768 | $3,213 | - | - |
$9,768
-
MMBtu
|
- | |
| 07 | 2.2437: Recover waste heat from equipment | $5,784 | $224 | - | - |
$5,784
-
MMBtu
|
- | |
| 08 | 2.4156: Establish a preventative maintenance program | $4,689 | $996 |
$4,361
94,192
kWh
|
$514
-
kW-mo/yr
|
- | $(-186.0) | |
| 09 | 2.4157: Establish a predictive maintenance program | $4,240 | $1,000 |
$4,383
94,661
kWh
|
$518
-
kW-mo/yr
|
- | $(-661.0) | |
| 10 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $3,383 | $4,160 |
$(-101.0)
(-2,173)
kWh
|
$(-31.0)
-
kW-mo/yr
|
$3,515
-
MMBtu
|
- | |
| 11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,016 | $195 |
$2,763
49,339
kWh
|
$253
-
kW-mo/yr
|
- | - | |
| 12 | 2.7241: Install outside air damper / economizer on hvac unit | $1,884 | $3,093 |
$1,479
31,937
kWh
|
$405
-
kW-mo/yr
|
- | - | |
| 13 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,076 | $31 |
$915
19,772
kWh
|
$161
-
kW-mo/yr
|
- | - | |
| 14 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $902 | - |
$765
16,521
kWh
|
$137
-
kW-mo/yr
|
- | - | |
| 15 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $766 | $3,539 |
$558
12,052
kWh
|
$208
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $355,105 | $178,881 |
$21,237
929,501
kWh
|
$7,163
-
kW-mo/yr
|
$335,612
-
MMBtu
|
$(-8,907.0) | ||
| TOTAL IMPLEMENTED | $295,348 | $52,374 |
$9,362
191,876
kWh
|
$1,273
-
kW-mo/yr
|
$292,959
-
MMBtu
|
$(-8,246.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs