ITAC Assessment: OR0049
ITAC logo
ITAC Assessment: OR0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product HARDWOOD & PALLET LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 62,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $251,430 9,285,463
kWh
Natural Gas $64,088 10,943
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,841 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,071

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6232: Install set-back timers $25,856 - $17,277
639,801
kWh
- $8,579
02 2.3212: Optimize plant power factor $12,480 $10,000 $12,480
-
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $607 $500 - $607
-
MMBtu
-
04 2.2122: Install / repair insulation on condensate lines $2,770 $3,720 - $2,770
-
MMBtu
-
05 2.4133: Use most efficient type of electric motors $132 $206 $132
4,982
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $996 $2,000 $996
36,928
kWh
- -
TOTAL RECOMMENDED $42,841 $16,426 $30,885
681,711
kWh
$3,377
-
MMBtu
$8,579
TOTAL IMPLEMENTED $40,071 $12,706 $30,885
681,711
kWh
$607
-
MMBtu
$8,579
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs